<br />.. <br /> <br />9.1.6 Progress Report - A construction progress report summarizing the contents of9.1.5 <br />shall be submitted to the State Engineer every 30 days or more frequently if directed by the <br />State Engineer. A summary report of all the items in Rule 9.1.5 shall be submitted at the end <br />of construction in accordance with Rule 10. <br /> <br />9.1.7 Notice for Inspection - The engineer shall give the State Engineer at least five days <br />advance notice of initial materials placement on the dam's foundation, in the cutoff trench, <br />outlet backfill, outlet foundation and any appurtenance requested by the State Engineer in <br />the approval of the plan for construction observation, to allow for observation by the State <br />Engineer. <br /> <br />9.1.8 Change Order - When unforeseen site conditions or material availability require that <br />the construction work differ significantly from the approved plans and specifications, a <br />change order, including details, must be provided by the engineer to the State Engineer. No <br />change shall be executed until approved by the State Engineer. Major changes must be <br />submitted in writing with supporting documentation, and approved in writing by the State <br />Engineer. Minor changes may be transmitted verbally by the engineer and approved by the <br />State Engineer verbally. <br /> <br />9.1.9 Final Inspection - The engineer shall give the State Engineer at least 10 days advance <br />written notice prior to the projects final construction inspection. <br /> <br />9.1.10 Completion of Construction - The engineer shall notify the State Engineer of the <br />completion of the construction in accordance with Rule 10. <br /> <br />9.2 Low Hazard and NPH Dams - Low Hazard and NPH dams require the owner to provide an <br />engineer experienced in dam design and construction, who shall be responsible for the following: <br /> <br />9.2.1 Construction Plan - Not less than 30 days prior to construction or as soon as possible <br />for dams whose construction season is affected by freezing weather, the engineer shall <br />notify the State Engineer in writing of the date construction will begin, the name of the <br />engineer in charge of the project, and the name ofthe contractor. <br /> <br />9.2.2 Engineer Observation - The engineer shall observe, or provide for the observation <br />by a qualified technician directly responsible to the engineer, the construction work on the <br />dam, the cutoff trench, and outlet works foundation to see that they are in substantial <br />accordance with the approved plans. The engineer shall endeavor to guard against defects <br />and deficiencies in the construction of the dam, and shall disapprove or reject work failing <br />to conform to the approved plans and specifications. <br /> <br />9.2.3 Inspection, Testing and Reporting - Periodic tests of construction materials shall be <br />taken and inspections of the construction made to verify that the work is completed in <br />accordance with the approved plans and specifications. Periodic progress reports shall be <br />submitted as requested by the State Engineer. The engineer shall compile a record of all <br />tests conducted, and any problems and remedies, for submittal to the State Engineer at the <br />end of construction. <br /> <br />31 <br />