Laserfiche WebLink
<br />Tasks: <br /> <br />1 A 1. Research existing commercial, state, regional or national electronic data mapping systems. <br /> <br />, <br />1 A 2. Determine if anyone or parts of several such (!laps could be used to build Colorado's GIS <br /> <br />map. <br /> <br />1 A 3. Determine the most cost effective and feasible scale of the map. <br /> <br />1 A 4. Select the Geographic Information System that is most easily updated by the website host. <br /> <br />1 A 5. Construct the map, include a user friendly "what if.." formula which allows the user to <br /> <br />project growth needs. The formula will also provide the user with the most recent information on <br /> <br />water availability in their basin. <br /> <br />1 A 6. Install GIS on the CWCB website. <br /> <br />Goal 2:' This project will illustrate where w~ter ,is stored, the amount of storage, and the <br /> <br />provider's capability to deal with a sustained dro~ght. <br /> <br />Obiective A: Through the survey, the contractor will determine the estimated sustained <br /> <br />drought reserve capacity of the water providers and the effectiveness of any existing <br /> <br />contingency plans. <br /> <br />Tasks: <br /> <br />2 A 1. Compile the drought reserve capacities and dross-reference the data with existing <br /> <br />4 <br /> <br />" <br /> <br />e <br /> <br />. <br /> <br />. <br />