My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01427
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:44 PM
Creation date
10/4/2006 6:54:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Non-Reimbursable Projects and Investigations - Southeastern Colorado WCD - Phase II Water and Storage Needs Assessment
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />e <br /> <br />Task 3. <br /> <br />Task 4. <br /> <br />Task 5. <br /> <br />Task 6. <br /> <br />Task 7. <br /> <br />P109l41.xopC.-.p4 <br /> <br />technical reviewlNEP A compliance efforts include eight tasks to be completed during <br />a 12-month period: <br /> <br />a. Project Scoping <br />b. Preliminary Engineering <br />c. Environmental Studies <br />d. Cultural Studies <br />e. Socio-Economic Studies <br />f. Water quality Studies <br />g. Project Management and Coordination <br />h. Alternatives Evaluation <br /> <br />GEl's monitoring and review of these activities on behalf of the District will be based on <br />ow: knowledge of the region, per.mittinglNEPA compliance issues, and experience on <br />sin:Ular projects. We will review detailed work plans for each task and the interim and <br />final work products, determine how these findings impact Project operations and the <br />District-wide storage demands, as identified in the Water and Storage Needs Assessment., <br />and brief the District Board in writing regarding our findings. <br /> <br />Panicipate in District discussions relative to developing and evaluating alternative plans <br />for storage with: <br /> <br />a. Bureau ofRec1amation <br />b. Colorado Springs Utilities <br />c. Other District beneficiaries <br />d. . Non-District entities <br /> <br />Support the district as needed in follow-up discussions and presentations to stakeholders <br />and the public. Participate in SSC D:1eetings as requested to help facilitate a District-wide <br />preferred storage option. <br /> <br />Review the MODSIM modeling ofFIY-Ark system to be perfoID:1ed by Montgornery- <br />..Watson to assw:e that Winter Water, If-and-When Accounts, and East Slope rights, <br />delivery limitations, and other key factors are properly and appropriately considered. <br />Assistance on this task will be provided by Helton & Willi3InSeIl, P.C. Use the <br />MODSIM model developed by others to test operating scenarios of interest to the District <br />for in-house review of storage options. <br /> <br />Work with the District entities in the Lower Basin to provide additional storage and <br />further assess the configuration, costs, and feasibility of a "Valley Pipeline." <br /> <br />Provide a preferred "Storage Options Plan," which documents Tasks 1 - 6 above, and <br />includes reco=endations for consideration by the Enterprise Board relative to preferred <br />storage options. <br /> <br />1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.