My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01427
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:44 PM
Creation date
10/4/2006 6:54:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Non-Reimbursable Projects and Investigations - Southeastern Colorado WCD - Phase II Water and Storage Needs Assessment
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTACHMENT 2 <br /> <br />E~TIMATED COST FOR SUPPORT <br /> <br />SERVICES BY GEl CONSULTANTS, INC. <br /> <br />.. <br /> <br />. <br /> <br />Our estimate of cost to support the District under the general scope of work provided in <br />Attachment 1 is summarized below. Our assumptions relative to level of effort are indicated. <br /> <br />Task 1 - Engineering Data <br />Develop conceptual designs and cost estimates for storage options. <br />(Assume 96 hours.) <br /> <br />Task 2 - Monitor and review technical review/NEPA compliance conducted <br />by Colorado Springs. (Assume 12 hours per month on average for 12- <br />month period, including report review, meeting attendance, etc.) <br /> <br />Task 3 - Participate in District discussions with participants. (Assume 6 <br />meetings at 8 hours each.) <br /> <br />Task 4 - Support the District as needed for stakeholder, public, SSC <br />meetings. Identify needs for additional investigations based on the <br />Task 3. (Assume 48 hours.) <br /> <br />Task 5 - Review and use MODSIM modeling being prepared by <br />Montgomery-Watson. (Assume 160 hours.) <br /> <br />Task 6 - Address Lower Basin conceplS relative to water supply, Valley <br />Pipeline. (Assume 80 hours.) <br /> <br />Task 7 - Prepare "Storage Options Snmmary" and recommendations to the <br />Enterprise Board. (Assume 48 hours.) <br /> <br />Total (Labor) <br /> <br />Expense allowance (8% of Labor Cost for Copies, Mileage, etc.) <br /> <br />Total <br /> <br />PIQg&4\zape... <br /> <br />2-1 <br /> <br />. $ 9,600 <br /> <br />18,000 <br /> <br />6,000 <br /> <br />6,000 <br />12,800 - <br />8,000 <br />6.000 <br />$66,400 <br />5.300 <br />$71,700 <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.