My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01427
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:44 PM
Creation date
10/4/2006 6:54:55 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Non-Reimbursable Projects and Investigations - Southeastern Colorado WCD - Phase II Water and Storage Needs Assessment
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/ <br /> <br />.. <br /> <br />December 17,1998 <br /> <br />ATTACHMENT 1 <br /> <br />e <br />.A ~t1 <br />1)~~ <br /> <br />SCOPE O:F SUPPORT SERVICES <br />TO <br />SECWCD <br />BY <br />GEl CONSULTANTS, INC. <br /> <br />Scope of Work <br /> <br />Services will be provided by GEl over the next 6 - 12 months to support the SECWCD in subsequent <br />phases of the Future Water and Storage Needs Assessment Project, consistent with recommendations <br />in the Final Report for the Water and Storage Needs Assessment completed in December 1998. The <br />tasks are listed below. The objective of these tasks is to develop a preferred Storage Options Plan, <br />which will meet the District-wide storage demands as documented in the Water and Storage Needs <br />Assessment <br /> <br />Task 1. Support the District on investigations/evaluations of the following alternatives: <br /> <br />Lake Meredith Enlargement <br />Review studies completed by Colorado Springs <br />Assess technical and cost issues <br /> <br />Fry-Ark Reoperation (See Task 5) <br />Review ongoing work of Colorado Springs <br />Work with District to develop a reoperation plan <br /> <br />- <br /> <br />Turquoise Lake Enlargement <br />Review prior USBR studies <br />Assess technical issues <br />Develop cost estimate <br />Assess social/environmental issues <br /> <br />Pueblo Reservoir (No activities by GEl) <br /> <br />Gravel Lakes Storage <br />Obtain data on current/planned mining operations <br />Assess regional geology <br />Assess technical feasibility and cost oflined water storage facilities <br /> <br />Non-Structural Alternatives <br />Develop, in greater detail, the concepts of drought leasing, drought insurance, water banking <br />Discuss concepts with selected District/SSC entities <br />Assess potential role in 'meeting District-wide objectives <br /> <br />Task 2. <br /> <br />Monitor and review the work to be W1dertaken by Montgomery- W atsonJBlack & Veatch <br />for Colorado Springs Utilities and provide advice to District. The Colorado Springs' <br /> <br />e <br /> <br />PI09&4~.lI'pd. <br /> <br />1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.