My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01321
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:00:18 PM
Creation date
10/4/2006 6:53:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/7/1961
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Kremmling-Green Mountain and Kremmling-Gore <br />Tap system of the transmission system. In- <br />vitations for bids on the Glen Canyon-Four <br />Corners section of the system will be opened <br />March 21st. <br /> <br />As far as the construction progress on <br />the participating projects, the da~ on the <br />Paonia Project is nearly 9~~ complete. With <br />regard to this project, I think you are all <br />aware that we have an extremely serious water <br />condition on the western slope. Unless, in <br />the next forty or fifty days, we get consid- <br />erable precipitation we will have a very <br />serious drought condition over there. We are <br />presently working with the local people to <br />see if we can provide some temporary storage <br />in that dam for the coming irrigation season. <br /> <br />1 <br /> <br />On the Smith Fork Project work is con- <br />tinuing on the dam. The diversion tunnel is <br />completed and ready now for lining. Work is <br />progressing in a small way in the construc- <br />tion of the dam itself. <br /> <br />As to the Florida Project, invitations <br />for bids for construction of the Lemon Dam on <br />this project are scheduled for issuance in <br />April. <br /> <br />On the Collbran Project, which is not a <br />participating project, bids were opened on <br />March 2nd for completion of the Upper and <br />Lower Molina Powerplants and Switchyards. We <br />also recently awarded a contract for the <br />small amount of transmission lines connecting <br />the two powerplants. Bids for construction <br />of the East Fork Diversion Dam, East Fork <br />Feeder Canal and the Bonham Dam Rehabilita- <br />tion will be opened on March 23rd. <br /> <br />1 <br /> <br />That concludes the construction portion. <br />Now we'll go on to Advance Planning. Under <br />Advance Planning we have the remaining unit <br />of the Curecanti Project which is the Crystal <br />Unit.. Design data for the Crystal Dam and <br />Powerplant have been assembled and they will <br />
The URL can be used to link to this page
Your browser does not support the video tag.