My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01250
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:22 PM
Creation date
10/4/2006 6:51:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/9/1964
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~J..J..O <br /> <br />MR. WOODSON: <br /> <br />"Mr. Chairman and members of the Board, <br />our report is quite brief so with your per- <br />mission I'll read the two principal items. <br /> <br />'Funds in the amount of $750,000 have <br />been made available for initiation of con- I <br />struction of the Trinidad project in Fiscal <br />Year 1965. These funds will permit acquisi- <br />tion of lands for the outlet works, initiation <br />of construction of the outlet works, and pre- <br />paration of plans and specifications for <br />other project features. Construction of the <br />outlet works is scheduled to start shortly <br />after January 1965. This schedule, of course, <br />is contingent upon the consummation of an <br />irrigation repayment contract at an early date. <br />Close coordination is being maintained with <br />the Purgatoire River Water Conservancy District <br />and the Bureau of Reclamation concerning the <br />repayment contract in order to maintain con- <br />struction schedules and assure continuing <br />appropriations for completion of construction. <br /> <br />Investigations and studies for flood <br />control and allied purposes have been continued <br />on the Arkansas River in Colorado. As pre- <br />viously reported, these investigations will <br />give consideration to single- and multiple- <br />purpose reservoirs, major drainage, channel- <br />ization, levees, floodways, and the eradication <br />of phreatophytes in the streambeds. Coordina- <br />tion of potential projects has been initiated <br />with other federal and state agencies, and it <br />is anticipated that a report on the study <br />above John Martin Dam will be completed by the <br />end of Fiscal Year 1965.' <br /> <br />I might add to that that we are studying <br />intensively a proposal for channel rectifica- <br />tion of the Arkansas River between Pueblo and <br />John Martin Dam which has a potential of short- <br />ening the length of the river between 20 and <br />25 percent. <br /> <br />I <br /> <br />Thank you." <br />
The URL can be used to link to this page
Your browser does not support the video tag.