My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01119
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:22 PM
Creation date
10/4/2006 6:50:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and that we will be ready to store Water in <br />Blue Mesa late this fall. <br /> <br />Contract has been awarded for the clearing <br />of the Blue Mesa Reservoir in the sum of $110,000 <br />to the Humphrey Contracting corporation of <br />Wichita, Kansas. <br /> <br />The contractor at Morrow Point Dam is <br />moving along. He is working three shifts a <br />day, five days a week. Progress at this struc- <br />ture is not as good as we had hoped for. <br />Presently about 17 percent of the work has <br />been completed. The contractor is primarily <br />doing work on the rock excavation for the <br />powerplant, keyways and the tunnel portals. <br />He has also made a start on the two penstock <br />tunnels. They are in the last stage of setting <br />up a concrete batchplant, and the cableway across <br />the dam for the placing of concrete has been <br />installed. A great amount of rock bolting has <br />been reEuired in this area. <br /> <br />At Crystal Dam, the last dam of the Cure- <br />canti Unit, ~ll the core drilling, the design <br />data, necessary for completing final design on <br />this dam is essentially completed and is in the <br />hands of our Chief Engineer's office. We expect <br />to call for bids on the first work on Crystal <br />Dam soon, which will consist of an access road <br />into this area. This is a very difficult piece <br />of construction. <br /> <br />Going on to the participating projects, <br />the Florida project, essentially all work has <br />been completed by the Bureau of Reclamation. <br />The Florida Water Conservancy District is com- <br />pleting the last work on rehabilitation of <br />approximately 50 miles of canal with funds <br />advanced by the Bureau. This distribution <br />system brings water to 11,900 acres of 19,450 <br />acres on the project. <br /> <br />On the Silt Project we are not making quite <br />as good progress on the Rifle Gap Dam as we had <br />hoped for. The work completed to date has con- <br />sisted of excavation of the open cut for the <br /> <br />'I <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.