My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01119
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:22 PM
Creation date
10/4/2006 6:50:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. STAPLETON: <br /> <br />the prime contractor for Ruedi Dam, has com- <br />pleted excavation of the outlet tunnel which <br />will be the tunnel used for diversion of the <br />river. This Was completed on January 19th. <br />This is another real milestone. The contractor <br /> <br /> <br />I <br />has started excavation for cutoff trenches on <br />the right abutment of the dam and for the coffer <br />dams. Work was started on a detour road over <br />the left abutment and work has continued on the <br />improvements of the road from Basalt to the dam- <br />site. We are pleased with the progress. The <br />contractor on this site should be able to make <br />good progress during the construction season <br />next summer. He has earned $802,000 of his $10~ <br />million contractual funds available, so this is <br />a substantial bit of progress. <br /> <br />Our mapping contracts are also proceeding. <br />These will give us basic topographic data to <br />permit us to complete our design data on certain <br />key features, including the railroad relocation <br />around the Pueblo Reservoir. <br /> <br />We are making good progress on the plans <br />for the Divide Tunnel. The Chief Engineer is <br />busily engaged in getting out the designs and <br />specifications, and we will advertise for bids <br />in March with the award in late Mayor early <br />June. This is right on schedule. <br /> <br />Our Hayden-Archer transmission work in <br />which we interconnect the Colorado River storage <br />transmission system with the Western bivision <br />of the Missouri River Basin is proceeding. We <br />have been making good progress in some phases <br />of this work in the pouring of footings and <br />stringing. While we anticipate some delays in <br />the Yampa Valley, the general progress on the <br />work is good. <br /> <br />I <br /> <br />This completes my report, Mr. Chairman. <br />I'd be very happy to answer any questions that <br />you might have." <br /> <br />"Thank you, Mr. Dugan. Do any members of <br />the Board have any questions on the report from <br />Region 7? Do any of our guests have any questions <br />
The URL can be used to link to this page
Your browser does not support the video tag.