My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01119
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:58:22 PM
Creation date
10/4/2006 6:50:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
2/11/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />We have analyzed available data on a <br />possible multiple-purpose development on the <br />Arickaree River. We have put this into a <br />letter report to your Director and have recommend- <br />ed that for the time being no further investiga- <br />tion should be done on this potential develop- I <br />ment. The economic problems that accompany this . <br />development would indicate that it should be <br />deferred and perhaps an investigation under- <br />taken at some future time when the possibilities <br />become more promising. <br /> <br />We have not engaged in further activities <br />on the st. Francis unit. <br /> <br />On the Narrows unit we are in the process <br />of preparing a feasibility report. The draft <br />of this report is scheduled for completion in <br />October. The agricultural and hydrologic <br />studies are progressing satisfactorily and <br />they'll be in shape for review by the cooperat- <br />ing federal agencies within the ne~t few weeks. <br /> <br />The reconnaissance report on the Upper <br />South Platte unit is nearing completion. It <br />is in the final review stages in our Washington <br />office and we hope to be able to present the <br />state and other interests in this basin with a <br />reconnaissance evaluation in the near future. <br />We are concurrently proceeding with feasibility <br />investigations on that unit and they are <br />scheduled for completion in 1968. <br /> <br />The st. vrain Unit has been reviewed with <br />the Steering committee on the St. Vrain-Boulder <br />Creek area. It does not appear that federal <br />funds will be available for detailed investiga- <br />tions in F. Y. '66. Any work that we will be <br />able to do on a continuing basis there will <br />have to be accomplished with basin funds. <br /> <br />I <br /> <br />Since your last meeting, design data have <br />been submitted to our chief Engineer for a <br />design and estimate on the Idylwilde Dam and <br />Reservoir of the Cache la poudre unit. We <br />should be getting to the point where we will be <br />able to advise you on the possibility for devel- <br />opment of that project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.