Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />prepared the final design plans and specifications. The proposed improvements include a new spillway, a sand <br />filter blanket along the downstream face of the dam, a perimeter toe drain with flow measuring devices, rip rap <br />placement along the upstream face of the dam, and reconstructing the dam crest. The project was awarded to Zak <br />Dirt, out of Longmont, Colorado, who commenced construction in December of 2000 and is approximately 90% <br />complete. The project is anticipated to be completed by August of2001. <br /> <br />8. Boulder & Lefthand Irrigation Companv - Twin Lakes Outlet Improvements <br />Authorization: Small Project Loan County: Boulder", N,E, of Boulder <br />Water Source: Boulder Creek Project Yield: 2,584 acre feet <br />Terms of Loan: $100,000 @ 3.75% for 20 yrs. Project Type: Outlet/Spillway <br /> <br />Twin Lakes is an equalizing reservoir that has an existing capacity of 218 acre-feet, located approximately 5 miles <br />northeast of Boulder. The State Engineer's Office during inspection of the facility determined that an outlet pipe <br />had deteriorated beyond repair and that a new spillway be incorporated into the reservoir. Given possible <br />restrictions imposed by the State Engineer's Office, the Boulder and Lefthand Irrigation Company elected to <br />construct a combined outlet/spillway structure, The new control structure consists of a 30" steel outlet pipe and <br />headgate, with a 36" drop inlet/spillway structure, Rocky Mountain Consultants, Longmont, Colorado, designed <br />the project. The project construction was awarded to Kemp-Hoffinan, out of North glenn, Colorado, The <br />Contractor has completed new outlet control structure, installation of the 30" steel outlet pipe, and is currently <br />working on raising the dam crest at certain locations The project is approximately 95% complete, The overall <br />project is anticipated to be completed by August 1,2001. <br /> <br />9, Julesburg Irrigation District - Peterson Control Structure Reconstruction <br />Authorization: Small Project Loan County: Sedgwick - N, of Ovid <br />Water Source: South Platte River Project Yield: 60,000 acre-feet <br />Terms of Loan: $100,000 @ 3,50% for 30 yrs, Project Type: Diversion Structure <br /> <br />This project involves the reconstruction of the Julesburg Irrigation District's Peterson Ditch control structure at <br />Lodgepole Creek. The improvements involve the construction of a new 12-ft. drop chute spillway that drops <br />flood flows into Lodgepole Creek, and the construction of a water control structure on Peterson Ditch. The water <br />control structure incorporates a 3-ft. slide gate to direct water into a cutthroat flume to measure augmentation <br />flows. Concrete Specialties, from Sterling, Colorado was awarded the project and has mobilized on-site and is <br />approximately 90% complete, The project is anticipated to be complete by August of 200 I, <br /> <br />10, Tunnel Water Companv - LaramieIPoudre Tunnel Rehabilitation <br />Authorization: Emergency Loan County: Larimer - W, ofFt. Collins <br />Water Source: Laramie River Project Yield: 15,085 ac. ft, <br />Terms of Loan: $1,600,000@4,75% for 30-yearsProject Type: Tunnel Rehabilitation <br /> <br />The existing LaramieIPoudre Tunnel is approximately 2 miles in length, diverting water directly from the Laramie <br />River and discharging it into Poudre River at a point approximately 60 miles west of Fort Collins, On May 28, <br />2000, a 400-ft. section of the tunnel collapsed, leaving the tunnel inoperable, The proposed project involves the <br />construction of new access roads and staging areas at both ends of the tunnel and the repair of the failed tunnel <br />area, at an estimated cost of $3,200,000, Rocky Mountain Consultants, Longmont, Colorado, has completed the <br />final design and will be monitoring the project during construction. Robison Construction, Inc" (RCI) the <br />Contractor, commenced construction in December of 2000, and is tentatively scheduled to be complete in the fall <br />of 200 1. The project is currently 60% complete, <br /> <br />11, Windsor Reservoir and Canal Companv - Various Canal and Reservoir Rehabilitations <br />Authorization: SB 96-153 County: Larimer- N, ofFt. Collins <br />Water Source: Cache la Poudre Project Yield: 30,000 ac, ft. <br />Terms of Loan: $2,357,000 @4.15% for 30 years Project Type: CanallRes, Rehabilitation <br />