<br />4. Consolidated Mutual Water Companv - Fortune Reservoir Dam Construction
<br />Authorization: SB 99-173 Cqunty: Jefferson'" NW of Arvada
<br />Water Source: Clear Creek Project Yield: 8,869 ac.ft,
<br />Terms of Loan: $16,300,000 @4.75% for 10 years Project Type: New Dam Construction
<br />
<br />e
<br />
<br />
<br />contract for Phase II, at a cost of $44,000,000, Construction of Phase II commenced in December 1999 and is
<br />approximately 95% complete. The project is tentatively scheduled for completion in October of 2001.
<br />
<br />This $20,000,000 project is the construction of a new 9,000 acre-foot reservoir northwest of Arvada, The project
<br />consists ofa 105-foot high, zoned earth embankment, l'robable Maximum Flood emergency spil1way, with a 30-
<br />inch diameter outlet pipe, Tuttle-Applegate, Inc. of Denver and CTLfThompson completed the final design plans,
<br />which have been reviewed and approved by the State Engineer's Office. The construction contract was awarded
<br />to R,E, Monk from Colorado Springs, Colorado, at a Contract price of $15,000,000, The distribution pipeline
<br />from the dam to the Company's treatment plant commenceq construction in October 1999 by Company forces,
<br />R.E. Monk commenced construction in March of 2000, witp project completion scheduled for March of 2002,
<br />The project is approximately 55% complete. '
<br />
<br />5. West Rhone Lateral Ditch Companv - Lateral Rec!)nstruction Proiect
<br />Authorization: Small Project Loan County: Weld - N, of Grand Junction
<br />Water Source: Grand Valley Canal P~oject Yield: 2,278 acre feet
<br />Terms of Loan: $100,000 @ 3.55% for 30 yrs. Project TYpe: Ditch Lateral Reconst.
<br />
<br />This project involves the reconfiguration of the West Illione Lateral Ditch Company's existing lateral, which is
<br />currently operated under Lateral 395, West Rhone's current use under Lateral 395 has been abandoned and new
<br />lateral and diversion point off the Grand Valley Canal is being constructed, The new lateral involves 1.25 miles
<br />of 12" 100 psi plastic pipe on a new alignment and the construction ofa new diversion structure on the Grand
<br />Valley Canal. The NRCS, Grand Junction office has completed the design and the project has been awarded to _
<br />EDEX Construction, out of Grand Junction, Colorado. The Contractor has completed the project and the users ...
<br />are currently operating it. The project is anticipated to be substantially complete by August I, 2001.
<br />
<br />Idaho Springs, Town of Idaho - Idaho Springs Reservoir ~ehabilitation
<br />Authorization: HB 98-1189 (jounty: Larimer - S. ofIdaho Springs
<br />Water Source: Chicago Creek Project Yield: 230 acre feet
<br />Terms of Loan: $955,000 @4.75% for 10 yrs. Project Type: Reservoir Rehabilitation
<br />
<br />In 1998 the State Engineer's Office restricted the storage height of the reservoir to be 9-ft. below the crest of the
<br />dam, reducing the storage capacity from 230 acre-ft. to 120 acre-ft. The storage restriction was due to excessive
<br />seepage and the poor condition of the spil1way, Harrison:Western Construction, and designlbuild group out of
<br />Denver, Colorado, was retained by the Town to design and construct the necessary improvements to restore the
<br />dam to its original storage capacity of230 acre-feet. The proposed improvements include, constructing a
<br />compacted earthfillliner on the upstream slope of the rest1rvoir and floor, construct new toe drains, raise the
<br />embankment dam crest by 2,5-ft., place rip rap and liner protection material above the earthfillliner, spil1way
<br />repairs, and fill the old borrow pit within the reservoir, H!lffison Western Construction has commenced
<br />construction in rehabilitating the dam face and wil1 continue working as weather permits, Project is anticipated
<br />to be completed in the fall of 2001. .
<br />
<br />7. Highland Ditch Company - Foothil1s Reservoir Dam Rehabilitation
<br />Authorization: SB 98-1198 - Severance Tax (::ounty: Boulder - W of Longmont
<br />Water Source: St. Vrain River project Yield: 450 ac,ft.
<br />Terms of Loan: $1,040,000 @ 4.0% for 30 years Project Type: Dam Rehabilitation
<br />
<br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in Boulder County. The e
<br />dam has an inadequate spillway and severe seepage throllgh the embankment and has had a storage restriction
<br />placed on it by the State Engineer. Smith Geotechnical Ilngineering Consultants of Fort Collins Colorado
<br />
|