My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01054
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:34 PM
Creation date
10/4/2006 6:49:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />, <br /> <br />Johnstown. Town of - Raw Water Pipeline <br /> <br />Authorization: SB 94-29 <br />Water Source: Big Thompson River <br />Terms of Loan: $2,500,000 @ 4% for 30 years <br /> <br />County: Larimer/Weld - W of Johnstown <br />Project Yield: 2,200 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />The project includes the replacement of II miles of open ditch with a 14-16 inch pipeline <br />from Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster <br />station at the reservoir and counection facilities at the treatment plant. PRC Environmental <br />Management, Inc. of Denver designed the project. The construction contract was awarded to Hall- <br />Irwin Construction Co. of Greeley and B.T. Construction, Inc. of Broomfield August 6, 1996: <br />Construction commenced in early October 1996 and was completed in June 1997. Project <br />documentation and final accounting is currently underway with substantial completion scheduled in <br />May 1999. <br /> <br />Excelsior Irrigating Companv - Excelsior Ditch Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $230,000 @ 3.75% for 30 yrs <br /> <br />County: Pueblo - E of Pueblo <br />Project Yield: 4,250 ac.ft. <br />Project Type: Ditch Rehabilitation <br /> <br />This $335,000 project is the re-construction of approximately 2 miles of open ditch, which <br />has previously been abandoned and farmed over. Also included in the project is the construction of <br />several pump stations for water delivery. The project is located in Pueblo County 10 miles east of <br />Pueblo. Project design was prepared by the Pueblo Office of the Natural Resource Conservation <br />Service, Ralph Adkins, P.E. of Pueblo, Irrigation Engineering of Alamosa and Hendrooke <br />Sprink1ers of Ft. Collins. Project construction commenced by the owner and several sub- <br />contractors in May 1998 with project completion scheduled for May 1999. <br /> <br />Julesburg Irrigation District - Harmonv Ditch #1 Diversion Structure Rehabilitation <br /> <br />Authorization: Emerg. Infrastructure Repair Account County: Logan - SW of Crook <br />Water Source: South Platte River Project Yield: 40,000 ac.ft. <br />Terms of Loan: $590,000 @ 3.75% for 30 years Project Type: Diversion Rehabilitation <br /> <br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony <br />Ditch # I diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br />Julesburg Reservoir. Zoyiopoulos & Associates of Greeley prepared the design plans and the <br />construction contract was awarded to Concrete Specialties, Inc. of Sterling in early January 1999. <br />Construction is currently 30% complete with substantial completion scheduled for May 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.