My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01054
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:34 PM
Creation date
10/4/2006 6:49:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Summit Reservoir and Irrigation Companv - Summit Reservoir and Ditch Svstem Rehab. <br /> <br />Authorization: SB 97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,000 @ 3.75% for 30 years <br /> <br />. <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac.ft. <br />Project Type: Reservoir and Ditch Rehab. <br /> <br />This project is the rehabilitation of the Summit Reservoir Dam outlet works and the <br />construction of repairs and improvements to the Summit Reservoir and Irrigation Company's water <br />collection and distribution facilities. The Cortez office of the Natural Resource Conservation <br />Service prepared the construction plans and specifications with the construction contract recently <br />awarded to Noland, Inc. of Mancos, CO. Construction is scheduled for completion in the spring of <br />1999. <br /> <br />Pinon Mesa Ranches Community Association - Rural Raw Water Svstem Construction <br /> <br />Authorization: SB 97-008 <br />Water Source: Florida River <br />Terms of Loan: $258,000 @3.75% for 30 yrs <br /> <br />County: La Plata - W of Ignacio <br />Project Yield: 125 ac.ft. <br />Project Type: Diversion and Dist. System <br /> <br />This $345,000 project is the construction of a new rural raw water irrigation and distribution . <br />system in La Plata County west of Ignacio. The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion <br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br />from the storage impoundment to the water users. RMI Environmental Services of Farmington, <br />New Mexico prepared the project design. Project construction commenced September 2, 1997 by <br />RMI Environmental Services of Farmington, New Mexico (a design/build contractor). The project <br />is currently 70% complete and continues to be on indefinite hold due to and financial problems. <br /> <br />Fort Morgan. City of - NCWCD Southern Pipeline Extension <br /> <br />Authorization: SB94-029, SB98-1l89, Svrnce Tax <br />Water Source: Colo.-Big Thompson/Windy Gap <br />Terms of Loan: $5,500,000 @4% for 40 years <br />$8,000,000 @ 4% for 30 years <br /> <br />County: Weld/Morgan - W ofFt. Morgan <br />Project Yield: 6,877 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />This project is an extension of the Northern Colorado Water Conservancy District's <br />Southem Pipeline Project. The pipeline extension will provide high quality westem slope water to <br />the City of Fort Morgan for their municipal use. Montgomery Watson, Inc. of Denver completed <br />the project design, from the Hudson/Ft. Lupton extension at Platteville, to the Fort Morgan area, in . <br />June. The construction contract was awarded to BRB Contractors, Inc. of Topeka, Kansas and <br />construction commenced September 1, 1998. Construction is approximately 55% complete with <br />project completion scheduled for late 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.