My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01023
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:15 PM
Creation date
10/4/2006 6:48:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/8/1959
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mountain and Lily Park sites to determine whether feasibility <br />investigations of a Juniper irrigation and power project will <br />be justified. The studies programed for F.Y. 1960 and F.Y. <br />1961 will inventory the possibilities and indicate a plan or <br />plans to be considered in feasibility studies. We have been <br />advised that the Colorado River Water Conservancy District is <br />- preparing topography for Juniper Reservoir site, and that this <br />topography will be available for ,our use when completed. <br /> <br />, Other Pro iects. Progress on the West Divide, Dallas <br />Creek and San Miguel projects is fairly routine. Preliminary <br />field inspections and spot checks show promise of realizing a <br />great~r acreage of irrigable project lands on Log Hill Mesa in <br />the Dallas Creek project. Anticipated fund curtailments on <br />future year programs have resulted in delays in the previously <br />indicated report completion dates~ Reports for these' projects <br />now are scheduled as follows: West Divide - December 1962, <br />Dallas Creek - July 1963, and San Miguel - June 1964. <br /> <br />Small Proiects. On June 22, 1959, representatives of <br />the Blue River Irrigation Company, including their attorney and <br />engineer, met with Regional representatives and discussed pro- <br />cedures relative to an application fur a S)Ilall Projects loan. <br />The spurce of water supply for the project would be the water <br />of the Blue River diverted from the Green Mountain Reservoir. <br /> <br />A meeting will be held in July with representatives <br />of the Orchard City Irrigation District to discuss a Small <br />Projects loan proposal near Eckert, Colorado. <br /> <br />That concludes the report. Do any of <br />the members of the Board have any comments <br />in connection with that? <br /> <br />I think that gets us into the agenda, <br />but here is another memorandum before that, <br />that is signed by Bob Barkley: <br /> <br />NORTIiERN COLORADO WATER CONSERVANCY DISTRICT <br /> <br />Loveland, Colorado <br />June 29, 1959- <br />M E M 0 RAN DUM <br /> <br />T~: Members of the Colorado Water Conservation Board. <br /> <br />Your Director's Memorandum of June 4, 1959 addressed <br />to members o:f the Board and the Investigation Commission, noted <br />that the assistance of the Commission had been requested for <br />study of pO~9r allocation and transmission from Glen Canyon, <br />Curecanti and Flaming Gorge. <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.