My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01023
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:15 PM
Creation date
10/4/2006 6:48:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/8/1959
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />1519 <br /> <br />opposed the same. The motion is carried. <br /> <br />I have two communications I would like <br />to read, a telegram to Mr. Sparks received <br />this morning from Senator Allott which reads <br />as follows: <br /> <br />'Full appropriations committee will likely <br />meet Wednesday to complete work on Public <br />Works Bill. Will be there to make certain <br />that Curecanti money remains in bill when it <br />goes to the full Senate. Also believe Bureau <br />of the Budget will clear Secretary Seaton's <br />certification sometime this week. <br /> <br />Signed - Gordon Allott, U. S. S.' <br /> <br />Then we received the following report <br />from Region 4 and I would like to read that <br />because it will be covering many of the proj- <br />ects which we will be considering on the <br />agenda: <br /> <br />Report on Bureau of Reclamation, Region 4, Activities <br />in Western Colorado <br />July 8 Meeting <br />Colorado Water Conservation Board <br /> <br />Construction <br /> <br />Paonia Proiect. Excavation work on Colorado Highway <br />No. 133 relocation, spillway, and outlet tunnel is continuing. <br />Work on the prime contract is about 20 percent complete in 17 <br />percent of contract time. Our Chief Engineer's office has agreed <br />to the wider crest width and other design changes for the high- <br />way which were proposed by the Colorado State Highway Department. <br /> <br />Collbran Proiect. Construction of Vega Dam is about <br />94 percent complete. Excavation work on the Souths ide Canal <br />tunnel has not progressed very rapidly. The Refinery Engineer- <br />ing Company has begun clearing work on the first 20 mile section <br />of the Souths ide Canal, but has not undertaken work on the two <br />powerplants. A $1,669,358 contract was awarded June 8th to <br />Davis and Butler, Salt Lake City, for construction of the Bonham- <br />Cottonwood Collection System. Advertising of bids on the remain- <br />ing 12 miles of the Southside Canal has been delayed but should <br />be ready early in F. Y. 1960. Invitations to bid will be issued <br />this month for powerplant turbines and generators. <br /> <br />Smith Fork Proiect. Required revisions in the defin- <br />ite plan report were submitted in May. Approval by the Secre- <br />tary of the Interior, to be followed by submission to the Bureau <br />of the Budget, is expected soon. A repayment contract will be prepared <br />
The URL can be used to link to this page
Your browser does not support the video tag.