My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01014
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:57:05 PM
Creation date
10/4/2006 6:48:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/22/1988
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br />72 1 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br /> <br />STATE OF COLORADO <br />~ <br /> <br />RrJ\ ROITH'f <br />Co'.prnnf <br /> <br />M E M 0 RAN DUM <br /> <br />j. \\1111,101 \-td)onald <br />DIIPftr" <br />Dd\ld \\ \.Vdlkt'r <br />OPPUI\ !iIP', 'Of <br /> <br />TO: Members, CWCB <br /> <br />!"ROM: Bill McDonald <br /> <br />DATE: September 14, 1988 <br /> <br />SUBJECT: Agenda Item 8, September 22-23. 1988, Board Meeting <br />Consideration of Proceeding with Authorized Projects <br /> <br />Introduction <br /> <br />Section 1 of chapter 257, Session Laws of Colorado 1988, <br />authorized the Board to make loans for the construction of <br />several projects. Among those were four projects which had not <br />been reviewed by the Board, they having not come through the <br />Board's feasibility study process. For each of these projects, <br />the act specifies that "moneys...shall not be made available... <br />until the board has in its sole discretion, determined that the <br />project is technically and financially feasible." <br /> <br />Discussion <br /> <br />The staff has completed a review of three of these four <br />projects. We have concluded that each of them is technically <br />and financially feasible. Write-ups on each project in this <br />regard are enclosed. <br /> <br />Recommendation <br /> <br />1 recommend that the Board find that each of these three <br />projects is technically and financially feasible and authorize <br />the staff to enter into the necessary loan contracts and to <br />proceed with construction. <br /> <br />JWM/gl <br />Enclosures: as stated <br /> <br />8209E <br />
The URL can be used to link to this page
Your browser does not support the video tag.