Laserfiche WebLink
<br />Proposal Review Checklist <br /> <br />. ___Site development plans depict the flood conveyance <br />subdistrict and base flood elevations. <br />___Engineering data is provided for map and flood conveyance <br />subdistrict revisions. <br />Flood conveyance subdistrict certification and data document <br />---no increase in flood heights. <br />Subdivision proposals minimize flood damage and protect <br />---utilities. <br />Manufactured (mobile) homes are elevated and adequately <br />---anchored. <br />Lowest floor elevations are above the base (100-year) flood <br />---elevation. <br />Non-residential flood proofing designs meet NfIP water-tight <br />---standards. <br /> <br />Permit Action <br /> <br />Permit Approved: Information submitted for the proposed <br />project was reviewed and is in compliance with approved <br />floodplain management standards (site development plans are on <br />file). <br /> <br />Permit Denied: the proposed project does not meet approved <br />floodplain management standards (explanation is on file). <br /> <br />. <br /> <br />___Variance Granted: A variance was granted from the base <br />(lOO-year) flood elevations established by FEMA consistent with <br />variance requirements of NFIP ~egulations Part 60.6 (variance <br />documentation is on file). <br /> <br />Floodplain administrator's signature <br /> <br />Date <br /> <br />Comments: <br /> <br />Development Documentation <br /> <br />___Map Revision Data: Certified documentation by a registered <br />professional engineer of as-built conditions for floodplain <br />alterations were received and submitted to FEMA for a flood <br />insurance map revision. <br /> <br />___Fill certificate: A community official certified the <br />elevation, compaction, slope and slope protection for all fill <br />placed in the floodplain consistent with NFIP regulations Part <br />6~.5 for flood insurance map revisions. <br /> <br />. <br /> <br />___Elevation Certificate:' Certified as-built elevation of the <br />structure's lowest floor ; flood proofing <br />level . An elevation certificate completed by a <br />registered professional engineer is on file. <br /> <br />___Certificate of occupancy or compliance issued <br /> <br />Date <br /> <br />-36- <br />