My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01004
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:56 PM
Creation date
10/4/2006 6:48:17 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/24/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. <br /> <br />~ <br />~- <br /> <br />- <br />t..... <br /> <br />- <br /> <br />OTERO DITCH COMPANY <br />ARKANSAS RIVER DIVERSION STRUCTURE REHABILIT A nON <br /> <br /> <br />Proiect Description <br /> <br />The Otero Ditch Company diverts water directly from the Arkansas River <br />approximately 1 mile northwest of the Town of Fowler. The existing diversion structure and <br />right abutment were washed out during flooding in April and May of 1999. This $620,000 <br />project involved stabilizing 2000 1.f. of streambank, the construction of a l82-ft. long concrete <br />diversion wall, 3-ft. high with a ll-ft. wide concrete stilling basin, and the construction of a <br />new concrete outlet control structure with a 20-ft wide by 8-ft. high opening. The Natural <br />Resource Conservation Service (NRCS), who is additionally funding 75% of the total <br />construction cost, designed the project. Schrepfer Industries, from Trinidad, Colorado, <br />constructed the project Proiect Data <br /> <br />Sponsor: Otero Ditch Company <br /> <br />County: Crowley <br /> <br />Water Source: Arkansas River <br /> <br />Terms of Loan: $100,000@4.00% for 30-years Substantial Completion Date: Sept. 1,2001 <br /> <br />Design Engineer: Natural Resource Conservation Service - Colorado Springs, Colorado <br /> <br />Construction Contractor: Schrepfer Industries, Inc. - Trinidad, Colorado <br /> <br />Design Criteria: 3-ft. High x 182 -ft. Long Concrete Diversion Wall <br />2,000 I.f. of Streambank Stabilizaton 20-ft. x 8-tl Outlet Structure <br /> <br />Annual Volume of Water Delivered by the Project: 20,687 acre-ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.