My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01004
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:56 PM
Creation date
10/4/2006 6:48:17 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/24/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />BOULDER AND LEFTHAND IRRIGATION COMPANY <br />DAVIS NO.1 DAM OUTLET WORKS AND SPILLWAY REHABILITATION <br /> <br /> <br />~-~ <br />i <br /> <br />II <br /> <br />;;; <br /> <br />Looking east across the dam at the new combined outlet and spillway structure. <br /> <br />Project Dcscriotion <br /> <br />- <br />~ <br />- <br /> <br />The Davis No.1 Dam is an equali;;:ing reservoir that has an existing capacity of 2 18 acre- <br />feet, locatcd approximately 5 miles northeast of Boulder. The State Enginecr's Office during <br />inspection of the facility detennined that an outlet pipe had deteriorated beyond repair and that a <br />new spillway be incorporated into the reservoir. Given possible restrictions imposed by the State <br />Engineer's Office, the Boulder and Lefthand Irrigation Company elected to construct a combined <br />outlet/spillway structure. The new control structure consists of a 30" steel outlet pipe and <br />headgate, with a 36" drop inlet/spillway structure. The project was designed by Rocky Mountain <br />Consultants, Longmont, Colorado. The project was constructed by Kemp-Hoffinan, out of <br />Northglenn, Colorado at a total project cost of $175,000. <br /> <br />Project Data <br /> <br />Sponsor: Boulder & Lefthand Irrigation Co. County: Boulder Water Source: Boulder Creek <br /> <br />Terms of Loan: $100,000@3.75%for20-years Substantial Completion Date: Sept. 1,2001 <br /> <br />Design Engineer: Rocky Mountain Consultants, Inc. - Longmont, Colorado <br /> <br />Construction Contractor: Kemp-Hoffinan, Inc. - Northglenn, Colorado <br /> <br />Design Criteria: 74 1.f. - 30" Restrained Ductile Iron Pipe <br />30"x 30" Watermain Series S-3000-F-Y Gate <br /> <br />4'x5'xlO' Conc. Outlet Tower <br />42" RCP Inlet Pipe <br /> <br />C Annual Volume of Water Delivered by the Project: 2,584 acre-ft. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.