Laserfiche WebLink
<br />'D <br /> <br />WEST RHONE LATERAL DITCH COMPANY <br />WEST RHONE LATERAL DITCH RECONSTRUCTION PROJECT <br /> <br />illI <br /> <br /> <br /> <br />~' <br />'~~ _.1 <br /> <br />!,~;#l;."~' ~ <br /> <br />..~ <br /> <br />~ <br />~. <br />JE'~ <br />... "":'"" -. ..... <br />"'""'_..... iiilI"' .,,:- <br /> <br />.- <br />.~ <br />:i2i. <br /> <br />Ell <br /> <br />;;... <br /> <br /> <br />,., <br /> <br />/' <br /> <br />~ <br /> <br />!~' <br /> <br />',~ '" <br />,~" ;'ii <br /> <br />',,"' <br /> <br />;.li;,; <br />... <br /> <br />.~ <br /> <br />11-'- <br /> <br />~ <br /> <br />,... <br /> <br />':JI <br /> <br />+' <br /> <br />'- <br /> <br />12 inch plastic pipe and various concrete control vaults along the west side of 21 Road. <br /> <br />Proiect Description <br /> <br />~ <br /> <br />- <br /> <br />, <br />This $130,000 project involved the reconfiguration of the West Rhone Lateral Ditch <br />Company's existing lateral, which was operated under Lateral 395 off the Grand Valley Irrigation <br />Canal. West Rhone's current use under Lateral 395 was abandoned and a new lateral and <br />diversion point off the Grand Valley Irrigation Canal was constructed. The new lateral involved <br />1.25 miles of 12" - 100 psi plastic pipe on a new alignment and the construction of a new <br />diversion structure on the Grand Valley Canal. The NRCS, Grand Junction otlice completed the <br />design and the project was constructed by Dominquez Farms, out of Grand Junction, Colorado. <br /> <br />Project Data <br /> <br />Sponsor: West Rhone Lateral Ditch Co. County: Mesa Water Source: Grand Valley Canal <br /> <br />Terms of Loan: $100,000 @3.55% for 30-years Substantial Completion Date: Sept. I, 200 I <br /> <br />Design Engineer: Natural Resource Conservation Service - Grand Junction, Colorado <br /> <br />Construction Contractor: Dominquez Farms, Inc. - Grand Junction, Colorado <br /> <br />Design Criteria: 6,600l.f. of 12" - 100 PSI Plastic Pipe <br />7' Lx 3' W x 6' H Concrete Outlet Structure <br /> <br />3"- 10" Cast Iron Gate Valves <br /> <br />- <br />l' Annual Volume of Water Delivered by the Project: 2,278 acre-ft. <br /> <br />- <br />