<br />519 <br /> <br />office in Denver the contract is essentially ready for start <br />of repayment negotiations with the water users. <br /> <br />Definite Plan Investiqation <br /> <br />Curecanti Unit.--A reconnaissance cost estimate for a concrete <br />arch dam at the Morrow Point site to water surface elevation 7,400 <br />has been received from the Chief Engineer. This estimate in I <br />combination with estimates for the smaller size dam backing <br />water up to Blue Mesa Dam, is being used to formulate the most <br />economical size dam for the Morrow Point and to determine wheth- <br />er the single dam or the Blue Mesa-Morrow Point combination is . <br />the most economical. The present schedule calls for submission <br />of a special report to our Commissioner in June, 1957, to estab- <br />lish economic feasibility as required by Public Law 485, however, <br />the Curecanti studies have been given priority following the de- <br />finite plan report on Glen Canyon which is due in February. The <br />approved Curecanti Special Report will provide the ba.sis for <br />early preparation of the definite plan report. It is hoped that <br />this will provide for the initiation of construction.in F.Y. 1958. <br /> <br />Paonia Project.--Tentative water supply operation studies have <br />been completed calling for an increase in total storage capacity <br />for Paonia reservoir from 18,000 to 21,000 acre-feet. A con- <br />tract was awarded for drilling 19 more holes at the dam.site <br />which will permit the Chief Engineer.to go forward with the pre- <br />paration of final designs and specifications to begin in Decem- <br />ber as scheduled. Necessary revisions in repayment contract <br />were discussed with representatives of the water users in Salt <br />Lake City last week but final decision as to whether present <br />contract can be amended or whether a new contract will be needed <br />is to be deferred until completion of the definite plan report <br />about April. In any event, we feel sure funds will be available <br />for construction in the F. Y. 1958. No definite assurance can <br />be obtained from the Overland Canal Company that they will parti- <br />cipate in the project; therefore it has been necessary to under- <br />take alternatire studies for serving water to Redlands Mesa by <br />means of other than the enlargement of the Overland Canal. <br /> <br />Smith Fork Project.-- Initial steps to be taken in the organiza- <br />tion of the Conservancy District have been discussed with the <br />attorney for the water association. Present plans are to com- <br />plete the conservancy district organization by next August in <br />order to get a tax levy established for the calendar year 1958. <br />Land classification is to be completed this winter. Construction <br />of Crawford Dam is scheduled to start in the F.Y. 1959. <br /> <br />I <br /> <br />Silt Project.--Bids were received for topographic mapping by <br />photogrammetric contract of about 12,000 acres encompassing the <br />project lands. Award of contract has been held up pending a <br />determination as to whether a combined bid including the project <br />lands of the West Divide project can be financed. It now appears <br />