Laserfiche WebLink
<br />1 appropriated, out of any moneys in the Colorado water conservation <br />2 board construction fund not otherwise appropriated, to the Colorado <br />3 water conservation board for allocation to the United States army corps <br />4 of engineers, the sum of one hundred fifty thousand dollars ($150,000), <br />5 or so much thereof as may be necessary, for costs associated with the <br />6 completion of the Cache La Poudre river floodway feasibility study. <br />7 (3) The moneys appropriated in subsection (2) of this section shall <br />8 remain available for the designated purposes until the project is <br />9 completed. <br />10 SECTION 12. Technical assistance to covered entities - <br />11 appropriation. (1) The Colorado water conservation board is hereby <br />12 authorized to contract with a responsible contractor for the purpose of <br />13 reviewing the technical standards used in preparing water conservation <br />14 plans, identifYing and prioritizing covered entities, and developing <br />15 strategies to provide technical assistance to those prioritized entities. The <br />16 study is to be conducted in fiscal year 2004-05. <br />17 (2) In addition to any other appropriation, there is hereby <br />18 appropriated, out of any moneys in the Colorado water conservation <br />19 board construction fund not otherwise appropriated, to the Colorado <br />20 water conservation board, the sum of two hundred ninety-five thousand <br />21 dollars ($295,000), or so much thereof as may be necessary, to conduct <br />22 the technical assistance to covered entities. <br />23 (3) The moneys appropriated in subsection (2) of this section shall <br />24 remain available for the designated purposes until June 30,2005. <br />25 SECTION 13. Gunnison river streamflow transit loss <br />26 cooperative study. (1) The Colorado water conservation board is hereby <br />27 authorized to participate in a stream gain/loss study along the Gunnison <br /> <br />-9- <br /> <br />SB03-110 <br />