Laserfiche WebLink
<br />, <br /> <br />1 amounts appropriated previously for the Colorado water conservation <br />2 board document imaging system. The moneys appropriated in subsection <br />3 (1) of this section shall remain available for the designated purposes until <br />4 the project is completed. <br />5 SECTION 10. Colorado floodplain map modernization - <br />6 appropriation. (1) In addition to any other appropriation, there is <br />7 hereby appropriated, out of any moneys in the Colorado water <br />8 conservation board construction fund not othenvise appropriated, to the <br />9 Colorado water conservation board, the sum of five hundred thousand <br />10 dollars ($500,000), or so much thereof as may be necessary, to assist with <br />11 the preparation of revised and improved floodplain studies and maps for <br />12 communities throughout Colorado and participate in federally sponsored <br />13 floodplain map modernization activities, <br />14 (2) The moneys appropriated in subsection (1) of this section shall <br />15 remain available for the designated purposes until the project is <br />16 completed. <br />17 SECTION 11. Cacbe La Poudre river floodway project - <br />18 appropriation. (1) The Colorado water conservation board is hereby <br />19 authorized to participate in a floodplain improvement feasibility study <br />20 along the Cache La Poudre river in the City of Greeley. The purposes of <br />21 the study are to define specific improvement projects to reduce flood <br />22 damage, restore the riparian envirorunent, create recreation opportunities, <br />23 improve water quality, and other associated envirorunental watershed and <br />24 floodplain enhancements. The scope of work for the project will be <br />25 developed by the board in consultation with the City of Greeley and the <br />26 United States army corps of engineers. <br />27 (2) , In addition to any other appropriation, there is hereby <br /> <br />-8- <br /> <br />SB03-110 <br />