Laserfiche WebLink
<br />-'v"':t'"":t <br /> <br />discuss water use problems and the purchase <br />of water from Bonny Reservoir under Warren <br />Act Contracts. .Farmers located along the <br />South Fork of the Republican River bel~l Bonny <br />Dam in Kansas were interested in the operation <br />of Bonny Reservoir and the possibility of ob- <br />taining releases for low flow augmentation. <br /> <br />I <br /> <br />Bureau of neclamation personnel met with <br />the engineering committee of the Republican <br />River Compact Administration in Denver on <br />March 2, 1966, to discuss a plan for selling <br />water from Bonny Reservoir under the Warren <br />Act for use in secondary oil recovery opera- <br />tions near Bartley, Nebraska. <br /> <br />The preliminary draft of the feasibility <br />report and the technical appendices were com- <br />pleted on the Narrows unit and forwarded to <br />the Commissioner and the Chief Engineer for <br />review. Region 7 review of this draft of the <br />report is virtually completed. <br /> <br />A status report on Two Forks Dam and Reser- <br />voir, Upper South Platte unit, was completed <br />and distributed to interested state and local <br />agencies. <br /> <br />Control surveys were completed for Turks- <br />head and Hudson Dam sites. The data obtained <br />from these surveys will be used in preparing <br />topographic maps. <br /> <br />The drilling program for Turkshead Dam <br />site was temporarily suspended on March 31 <br />pending receipt of additional funds. <br /> <br />At the Two Forks Dam site, the rocl. test- <br />ing program continued in the exploratory <br />tunnels, and the analysis of data from pre- <br />vious material investigations was started. <br /> <br />I <br /> <br />Work continued on layout of road reloca- <br />tions on maps of the Two Forks Reservoir, <br />using standards furnished by the Forest Ser- <br />vice. <br />