My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00983
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:56:31 PM
Creation date
10/4/2006 6:47:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
4/13/1966
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-'VVoL <br /> <br />negotiations for the dam site construction <br />areas, March, 1967: and for the balance of <br />the reservoir area, January, 1968. <br /> <br />I <br /> <br />On the Mount Carbon Flood control project <br />on Bear Creek, on 28 February 1966 officials <br />of the Colorado Highway Department, the Colo- <br />rado Water Conservation Board, the Inter- <br />County Regional Planning Commission, and <br />Denver's platte River Development Committee <br />met in our Omaha offices to discuss methods of <br />accommodating highway improvements and flood <br />control requirements in the Bear Creek valley <br />at the Hount Carbon site. As a result, this <br />District adopted schedules which provide for <br />holding a public hearing on the Mount Carbon <br />project in Denver in mid-July 1966 and for com- <br />pleting our report in August 1966. The Colorado <br />Highway Department has advised us that they <br />will modify their highway construction schedules <br />SUfficiently to permit congressional consid- <br />eration of our flood control proposals in the <br />next congress. "le have requested that the <br />Chief of Engineers authorize an Interim Report <br />on Bear Creek. <br /> <br />I <br /> <br />Regarding flood plain information <br />schedules in the Denver metropolitan area..' <br />Volume III of the Denver metropolitan flood <br />plain information series, which describes the <br />flood hazard areas on Bear Creek from Morrison <br />to the mouth and on Clear Creek from Golden <br />to the mouth was released for public informa- <br />tion on 6 April 1966. The staff of this Board, <br />the Inter-county Regional Planning Commission, <br />and the Omaha District cooperated in acquaint- <br />ing the public with the availability of this <br />report at a meeting of the Executive Commit- <br />tee of the Commission on 6 April, and by <br />appropriate press coverage. copies of this <br />report are available through the Water Conser- <br />vation Board, the Inter-County Regional <br />Planning Commission, or the Omaha District, <br />corps of Engineers. <br /> <br />Volume IV of the flood plain information <br />series is in preparation. The streams <br />
The URL can be used to link to this page
Your browser does not support the video tag.