Laserfiche WebLink
<br />. <br /> <br />The Greeley and Loveland Irrigation Company and its sister company the Seven Lakes Irrigation Company, own and <br />operate an extensive system of reservoir and canals in Loveland and the Greeley area. The Greeley and Loveland <br />Irrigation Company owns Boyd Lake, the largest reservoir in their system with a surface area of 1,750 acres and a <br />capacity of 48,875 acre-feet. The dam is a Class I facility. The existing spillway is a 20-foot long grass swale with <br />really no means of conveying any storm flows. The SEO requires that a Class I facility spillway pass 75% of the PMP. <br />The Company is currently in the design phase to construct a new labyrinth spillway approximately 1,100 feet in length <br />with an effective weir length of 5,720 feet, constructing 1,100-feet of downstream channel, and constructing 350-ft long <br />floodwall. The project is currently being designed by Boyle Engineering and is anticipated to commence construction <br />in summer of2005. <br /> <br />13. Upper Arkansas Water Conservancy District - N. Fork Reservoir Rehabilitation <br />Authorization: Severance Tax Fund County: Chaffee/CusterlFremont <br />Water Source: N. Fork of S. Arkansas Project Yield: 500 acre-feet <br />Terms of Loan: $3,520,000 @3.50% for 30 yrs. Project Type: Reservoir Rehabilitation <br />The UAWCD has operated the North Fork Reservoir since 1979 for domestic, municipal, industrial, recreational, <br />and augmentation water supply. The reservoir is at elevation 11,400 feet and is located approximately 10 miles <br />from Maysville on the North Fork of the South Arkansas River. This project involves replacement of the outlet <br />gate, improved access, increased spillway capacity, seepage control, and raising the dam 15-feet to achieve a <br />storage capacity of 500 acre-feet. The project is currently under design and is anticipated to commence <br />construction in June of 2005. The project is located on Forest Service property and will require a special use permit <br />and an environmental assessment prior to construction, <br /> <br />. <br /> <br />14. South Side Irrigation Company - South Side Reservoir Rehabilitation <br />Authorization: Construction Fund County: Larimer - Near Loveland <br />Water Source: South Platte River Project Yield: 1,241 acre-feet <br />Terms of Loan: $360,000 @3.10% for 30 yrs. Project Type: Reservoir Rehabilitation <br /> <br />The South Side Reservoir Company operates the South Side Reservoir, which provide irrigation water within a <br />1,590-acre service area. The South Side Reservoir is located approximately 1 mile southwest of the City of <br />Loveland. This $400,000 project involves rehabilitation of the outlet structure and spillway. These <br />improvements will eliminate the current storage restrictions imposed by the State Engineers Office. The project is <br />currently under design and is scheduled for construction in the winter of2005. <br /> <br />15. Poudre Tech Metro District - Dual Water System <br />Authorization: Construction Fund <br />Water Source: Cache La Poudre <br />Terms of Loan: $2,180,000@4.75%for30-years <br /> <br />County: Weld <br />Project Yield: 740 acre-feet <br />Project Type: Water Supply <br /> <br />Poudre Tech Metro District, among other services, provides outside irrigation water for the Water Valley and <br />Hilltop Subdivisions, located in the Town of Windsor. The purpose of this project is to construct the Infrastructure <br />to expand its services to supply outside irrigation water to an additional 1500 residential homes. The proposed <br />construction activities include the completion of two reservoirs with a combined storage capacity of 2,000 acre-feet, <br />three pumping plants, and the installation of 67,000 linear feet of 4-inch to lO-inch irrigation pipe and associated <br />valves, fittings, and taps. The earthwork is currently under construction. Engineering design for the headgate, <br />intake, and pumping facilities has been completed. The applicant has secured alternate financing for the project. <br />The loan for this project was de-authorized at the November 2004 Board Meeting. <br /> <br />. <br /> <br />16. Beaver Reservoir Company - Reservoir Rehabilitation <br />Authorization: Severance Tax Fund County: Gunnison <br />Water Source: Minnesota Creek Project Yield: 1,620 acre-feet <br />Terms of Loan: $128,500@2.50% for 30-years Project Type: Reservoir Rehabilitation <br />