My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00935
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:38 PM
Creation date
10/4/2006 6:46:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/5/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O.J..V.J.. <br /> <br />I <br /> <br />I think it is a safe statement to make that <br />all of our projects, in Colorado and else- <br />where, are being stretched out as far as <br />completion is concerned. I know that none <br />of our projects within the state are pro- <br />ceeding on the construction schedule that <br />was originally planned when the projects <br />were authorized. This is a nation-wide <br />problem. Each project, of any magnitude, <br />will be delayed from two to three years be- <br />cause of lack of funds. For some of our <br />projects that are ready to start, such as <br />the Fruitland Mesa and the Crystal, we have <br />no funds for construction starts this year. <br /> <br />It is quite obvious that we are facing <br />an alarming situation with the backlog of <br />construction work. At the present time the <br />projects under construction, together with <br />those authorized for construction will cost <br />in excess of $800 million. This means that <br />even if we completed them within the next <br />eight years we would need appropriations <br />annually in the magnitude of $100 million. <br />The backlog right now is greater than all <br />of the projects that we have ever had con- <br />structed in the total history of colorado. <br />We have been quite successful in getting <br />authorizations and now our future problem <br />will be to get funds. <br /> <br />I <br /> <br />Another significant item in the Omaha <br />District report is the authorization of <br />the Mount Carbon project. As the Board <br />knows, Mount Carbon has always posed a <br />tremendous flood threat to the city of <br />Denver and the metropolitan area, particu- <br />larly so now in view of the extensive devel- <br />opment along Bear Creek itself. Historically <br />Bear Creek has caused the loss of many lives <br />in the Denver metropolitan area. We were <br />extremely anxious to get that project auth- <br />orized and under way. In this year when it <br />was very difficult to obtain new authoriza- <br />tions, our congressional delegation was <br />
The URL can be used to link to this page
Your browser does not support the video tag.