My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00935
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:38 PM
Creation date
10/4/2006 6:46:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/5/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />v~~~ <br /> <br />included fish and wildlife and recreation <br />in the proposed plan as a project purpose <br />and has incorporated the following as project <br />features: <br /> <br />I <br /> <br />a. Seventeen excavated fish lakes <br />totaling 208 acres located in the flood plain <br />of Arkansas River between Pueblo and Las <br />Animas; <br /> <br />b. Low wetland areas totaling about <br />500 acres in the Arkansas River flood plain <br />between Pueblo and Las Animas for waterfowl <br />habitat; <br /> <br />c. Fencing of all lands to be acquired. <br />for construction of the Arkansas River <br />channelization project from Pueblo to Las <br />Animas including selected fish and wildlife <br />and recreation areas adjacent to the proposed <br />project. The estimated costs of these <br />features are as follows: <br /> <br />Seventeen fishing lakes, federal cost <br />$505,000, nonfederal $505,000*, total first <br />cost $1,010,000, annual O&M nonfederal <br />$10,500; fencing and additional lands, <br />federal cost $459,000, nonfedera1 $97,400, <br />total first cost $556,400, annual O&M non- <br />federal $3,050; wetlands, federal cost $90,400, <br />nonfederal $80,000, total first cost $170,400, <br />annual O&M nonfedera1 $5,090. Totals, federal <br />cost $1,054,400; nonfederal $682,400; total <br />first cost $1,736,800; annual O&M nonfedera1 <br />$18,640. (*Includes $491,000 cash contribu- <br />tion toward construction.) <br /> <br />I <br /> <br />On the Arkansas River below John Martin <br />Dam preauthorization planning, investigations <br />and studies for flood control and related <br />purposes are being continued in the Arkansas <br />River subbasin from John Martin Dam to Great <br />Bend, Kansas, in cooperation with local in- <br />terests, state, and other federal agencies. <br />In Colorado, consideration is being given to <br />
The URL can be used to link to this page
Your browser does not support the video tag.