My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00935
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:55:38 PM
Creation date
10/4/2006 6:46:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/5/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OUJ~ <br /> <br />complete in itself and comes within the <br />purview of the above law, the Chief of <br />Engineers has authorized preparation of <br />a detailed planning report as the basis <br />for further development of the project and <br />allotment of construction funds. For this <br />reason, the proposed Cotopaxi local protec- <br />tion project was eliminated from the proposed <br />plan. <br /> <br />I <br /> <br />With the exception of the proposed Rocky <br />Ford local protection project, local inter- <br />ests have expressed concurrence in the <br />selected plan of improvement and have indi- <br />cated their willingness to cooperate in the <br />construction, operation, and maintenance of <br />the individual projects comprising the plan. <br />The city of Rocky Ford does not desire to <br />sponsor the Rocky Ford local protection proj- <br />ect which was, therefore, also eliminated <br />from the proposed plan. <br /> <br />The total first cost of the plan of <br />improvement, omitting the proposed local <br />protection projects at Cotopaxi and Rocky <br />Ford is estimated at $66,770,000, of which <br />$48,541,000 would be federal and $18,229,000 <br />nonfederal. Annual operation and maintenance <br />cost is estimated at about $432,700, of which <br />$429,700 is nonfederal. The federal and non- <br />federal annual charges amount to $1,714,980 <br />and $1,070,720, respectively, a total of <br />$2,785,700. The average annual benefits are <br />estimated at $4,680,750. A comparison of <br />the annual benefits with the annual charges, <br />which are based on an economic life of 100 <br />years and 3-1/4 percent interest rate, yields <br />a benefit-cost ratio of 1.7. Also, each <br />project comprising the plan of improvement <br />is individually justified. <br /> <br />II <br /> <br />As a result of consultations with the <br />Colorado Department of Game, Fish and Parks, <br />and with the Bureau of Sport Fisheries and <br />Wildlife, the Albuquerque District has <br />
The URL can be used to link to this page
Your browser does not support the video tag.