Laserfiche WebLink
<br />ATIACHMENT 6 <br /> <br />e <br /> <br />FPR 99-498 <br />Flood Insurance Study, Town of Parker, Colorado, dated March 2, 1993. <br /> <br />KEY ISSUES: <br />. The 1993 FIS revised the 1989 FIS. <br /> <br />· The 1989 FIS included revised detailed floodplain information for a portion of Cherry Creek. <br /> <br />. The 1993 PIS was subsequently revised by the 1996 (already designated). <br /> <br />· The changes in the 1993 FIS for Parker which affected unincorporated Douglas County were reflected <br />in the 1993 FIS for Douglas County (to be designated; see Attachment 9). <br /> <br />COMMUNITY RESPONSE: <br />Despite a letter from the CWCB and repeated telephone messages to the Town of Parker <br />Public Works Director, the only response from the town was two telephone messages from <br />the Public Works Director to the ewCB staff. We were told that the Public Works Director <br />is very busy and is allocating his time as he needs to allocate it to get his work done. The <br />town has not voiced either support for or objections to the proposed CWCB action. <br /> <br />SUMMARY: e <br />The staff recommends Board approval of the floodplain resolution for the Town of Parker <br />designating the Flood Insurance Study dated March 2, 1993. The detailed and approximate <br />floodplain infonnation contained in the FIS meets the Board's "Floodplain Designation and <br />Approval Rules". The designation action will assure that the previously prepared floodplain <br />information for the Town of Parker is explicitly approved by the state, thereby complying with state <br />statutory requirements. <br /> <br />e <br /> <br />10 <br />