My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00887
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:59 PM
Creation date
10/4/2006 6:45:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/8/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I might add just a little bit to it, <br />Dave. You can correct me if I'm wrong, but <br />we are running into some unexpected delays <br />on construction, not only here in Colorado, <br />but nation-wide, as far as projects are con- <br />cerned. Those delays are being occasioned as a <br />result of the emphasis on the undeclared war <br />in viet Nam. <br /> <br />I <br /> <br />I spent most of the month of Hay in <br />Washington in connection with current legisla- <br />tion there. I had several conferences with <br />Commissioner Dominy and his staff about the <br />construction program in Colorado. It was <br />originally planned tl1at bids on Crystal, the <br />last unit of the Curecanti project, would be <br />let during this past spring and that bids <br />similarly would be let for the construction <br />of the Bostwick Park project this last spring. <br />But there has been an order from the Adminis- <br />tration to slow down federal spending which <br />has caught Us in the reclamation program. At <br />this time it is definite that no bids will be <br />let on Crystal Dam this year. HO\olever, there <br />was a promise made tl1at a contract would be let <br />for the construction of the Bostwick Park Proj- <br />ect sometime this summer or early in the fall. <br />So in both cases of crystal and Bostwick Park <br />we are falling a year behind. <br /> <br />This slowdown is affecting us, to some <br />extent, on all projects. However, for the <br />authorized projects 1'Ie have still to be con- <br />structed, the Savery-Pot Hook and Fruitland <br />Mesa, the definite plan formulation is proceed- <br />ing pretty much according to schedule. <br /> <br />Is there any further comment or question <br />on Region 4's report? Thank you, Dave. <br /> <br />1 <br /> <br />I will call attention to Region S's <br />report. I don't tl1ink tl1ere is anybody here <br />from Region 5. Unless there is objection the <br />report of Region 5 will be included in the <br />minutes as though read in full. The reports <br />
The URL can be used to link to this page
Your browser does not support the video tag.