Laserfiche WebLink
<br />I <br /> <br />1 <br /> <br />report is scheduled for completion in the <br />middle of fiscal year 1967. <br /> <br />Advance planning studies on the Savery- <br />Pot Hook project consisting of land classifica- <br />tion, drainage investigations, water supply <br />studies, and geologic investigations have been <br />undertaken in fiscal year 1966. Foundation <br />drilling completed early in the year verified <br />the Savery damsi te to be'- acceptable geological- <br />ly. Foundation explorations have also been <br />completed at the inlet and. outlet portals of <br />the tunnel to divert from Pot Hook Reservoir <br />to the Pot HO~, Canal. A definite plan report <br />is scheduled for completion in fiscal year <br />1969. <br /> <br />Advance planning studies on the Bostwick <br />Park Project have been completed and construc- <br />tion designs and specifications for Silver Jack <br />Dam are well advanced. Most-or the preconstruc- <br />tion surveys and geological explorations for <br />this feature of the project have been completed. <br /> <br />The aerial topographic mapping contract <br />on the Basalt project covering the Basalt Con- <br />duit alignment from the outlet of Ruedi Reser- <br />voir to the Missouri Heights Reservoir is <br />nearing completion. This work is being per- <br />formed with funds contributed by the Colorado <br />Water Conservation Board. <br /> <br />under our Small Reclamation projects <br />Program, the Orchard City Irrigation District <br />project is ready for service this irrigation <br />season. <br /> <br />Well, gentlemen, it is a pleasure to be <br />here and to renew our acquaintance. If there <br />is anything further, ~tr. Jennings and myself <br />would be most pleased to respond to tile extent <br />of our knowledge." <br /> <br />MR. SPARKS: <br /> <br />"Are there any questions on Itr. Crandall 0 s <br />report? <br />