My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00887
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:59 PM
Creation date
10/4/2006 6:45:25 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/8/1966
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />appendix are in progress on the Bluestone <br />Project. Foundation explorations were com- <br />pleted at the Una damsite. Funds contributed <br />by the Colorado River Water Conservation Dis- <br />trict were used to expedite this drilling. A <br />proposed feasibility report is scheduled for <br />completion in the middle of fiscal year 1968. <br /> <br />On the Grand Mesa project, water supply <br />studies and plan formulation studies are in <br />progress. Completion of aerial topographic <br />maps of tile Electric Mountain Service Canal by <br />private contract is approximately 85 percent <br />complete. A proposed feasibility report is <br />scheduled for completion by the end of fiscal <br />year 1968. <br /> <br />Feasibility investigations are continuing <br />on tile Upper Gunnison project, consisting of <br />plan formulation studies and water supply <br />studies. A proposed feasibility report is <br />scheduled for completion fiscal year 1969. <br /> <br />preparation of design data for all project <br />canals and laterals, water supply studies, <br />geologic investigations, and preparation of <br />the Operation, Maintenance, and Replacement <br />Appendix are in progress on the Yellow Jacket <br />Project. A proposed feasibility report is <br />scheduled for completion by the end of fiscal <br />year 1967. <br /> <br />1 <br /> <br />under Advance Planning, on the Fruitland <br />Mesa project the aerial mapping of the project <br />area by private contract has been completed. <br />Advance planning studies are well under way <br />consisting of reanalysis of feasibility report <br />data on water supply, agricultural economy, 1 <br />land classification, drainage, repayment studies, <br />and cost estimates. Classification of addi- <br />tional lands resulting from realignment of the <br />Fruitland Canal has been completed. Foundation <br />explorations have been completed at outlet <br />portal and are in progress at the inlet portal <br />of the Black ~wsa Tunnel. A definite plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.