Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Wamsley Cattle Company - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $45,000 @ 3% for 40 years <br /> <br />County: Jackson <br />Project Yield: 1,905 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br />dam's upstream slope, The remaining work includes placement of the upstream face riprap and <br />installation of the outlet gate. The project has been re- scheduled for completion in 1998. <br /> <br />Durkee Ditch Company - Rehabilitation of the Durkee Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Currant Creek <br />Terms of Loan: $I20,000@ 3,75% for 30 yrs <br /> <br />County: Delta <br />Project Yield: 2.000 ac,ft. <br />Project Type: Headgate and Pipeline <br /> <br />This $343,000 project is the construction of a new concrete headgate and turnouts. and <br />construction of approximately 13,000 feet ofPVC pipeline replacing an open channel ditch in Delta <br />County northeast of Delta, Colorado, The Delta and Grand Junction Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced September 8, 1997 <br />by K C Equipment and Consulting of Delta, Colorado, Phase I of the project was completed in <br />December 1997 with the final Phase II scheduled for completion in October 1998, The project is <br />currently 50% complete. <br /> <br />Agricultural Ditch and Reservoir Company - Rehabilitation of the Welch Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Clear Creek <br />Terms of Loan: $300,000 @ 5,25% for 30 yrs <br /> <br />County: Jefferson <br />Project Yield: 1,000 ac.ft, <br />Project Type: Pipeline and Pumps <br /> <br />This $600,000 project involves the abandonment of portions of the Welch Ditch, <br />construction of a dropout structure on the Welch Ditch. a pipeline from the Agricultural Ditch to <br />the Welch Ditch, and construction of three lift stations to pump water from the Agricultural Ditch <br />back to the Welch Ditch at various locations, The need for the project is due to several landslide <br />areas along the Welch Ditch, which continue to create high maintenance and water delivery <br />problems for the company. The project is located in Jefferson County east of Green Mountain, <br />Project design was prepared by Mountain States Engineering Associates, Inc, from Lakewood, <br />Colorado. The pipeline and dropout structure project commenced construction November 3, 1997 <br />by T. Lowell Construction, Inc. of Castle Rock, Colorado. with project completion scheduled for <br />April 1998, As a result of an unacceptable bid from a single bidder, the first of three pump station <br />projects is scheduled to commence shortly with the owner acting as the general contractor, <br />