My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00878
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:54 PM
Creation date
10/4/2006 6:45:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Hawkeye Lateral Ditch Company - Rehabilitation ofthe Hawkeye Lateral Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Colorado River /Grand Valley Canal <br />Terms of Loan: $143,000 @3.75%for30yrs <br /> <br />County: Mesa <br />Project Yield: 1,260 ad!. <br />Project Type: Pipeline <br /> <br />This $393,000 project is the construction of approximately I 1,750 linear feet of pipeline <br />replacing an existing open concrete ditch in poor condition, The project is located in Mesa County <br />northeast of Fruita, The Grand Junction Office of the Natural Resource Conservation Service <br />prepared project design, The construction contract was awarded to L & M Construction, Inc. of <br />Grand Junction November 7, 1997 and is scheduled for completion in April 1998. The pipeline <br />project is currently 50% complete, <br /> <br />Chipperfield Lane Ditch Company - Chipperfield Lane Headgate and Pipeline Rehabilitation <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Dry Hollow Creek <br />Terms of Loan: $60,000 @ 3,75% for 30 yrs <br /> <br />County: Garfield <br />Project Yield: 220 ac,ft, <br />Project Type: Headgate and Pipeline <br /> <br />This $80,000 project is the construction of 10,000 feet of pipeline replacing an existing <br />open ditch in poor condition, The project also consists of reconstruction of the existing inlet <br />structure at the Multa Trina Ditch, The G1enwood Springs office of the Natural Resources <br />Conservation Service prepared project design, Project construction commenced November 1, 1997 <br />by the Ditch Company's own forces, Project completion is scheduled for April 1998. The pipeline <br />project is currently 75% complete, <br /> <br />Decker Lateral Company - Rehabilitation of the Decker Lateral Ditch <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Owl Creek Supply and Irrigation <br />Terms of Loan: $100,000@4.25%for30yrs <br /> <br />County: Weld <br />Project Yield: 4.000 ac.ft. <br />Project Type: Concrete Ditch Lining <br /> <br />This $145,000 project is the concrete lining of approximately 7,900 feet of an existing open <br />channel irrigation ditch in Weld County northeast of Greeley, The Greeley Office of the Natural <br />Resource Conservation Service prepared project design, The construction contract was awarded to <br />Pete D&L Contractors, 1nc, of Evans, Colorado Noyember 5, 1997. Project construction is <br />scheduled to commence November 18, 1997 with project completion scheduled for April 1998, <br />This ditch lining project is currently 50% complete, <br />
The URL can be used to link to this page
Your browser does not support the video tag.