Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Greelev and Loveland Irrigation ComDanv - Horseshoe Dam #2 Outlet Rehabilitation <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Big Thompson River <br />Terms of Loan: $75,000 @4.21% for 30 yrs. <br /> <br />County: Larimer - NE of Loveland <br />Project Yield: 8,051 adt. <br />Project Type: Dam Outlet Rehabilitation <br /> <br />This project is the rehabilitation of the Horseshoe Dam #2 outlet structure, located jilst <br />northeast of Loveland in Larimer County. The outlet became inoperable in May 1998 and has been <br />temporarily blocked shut since then. The Greeley and Loveland Irrigation Company has contracted <br />with Boyle Engineering Corporation of Lakewood to analyze design alternatives and complete <br />construction plans and specifications. Construction is scheduled to commence in the late fall of <br />1998 with completion scheduled for the spring of 1999. <br /> <br />l; <br /> <br />Wood Lake Mutual Water & Irrigation ComDanv - Wood Lake Dam Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Cache la Poudre River <br />Terms of Loan: $188,000 @3.75%for 30 years <br /> <br />County: Weld- W of Eaton <br />Project Yield: 3,106 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the replacement of the Wood Lake Dam outlet works including all control <br />structures, installation of a toe drain, raising the existing saddle dam, and construction of a spillway <br />to pass the 50% Probable Maximum Precipitation flood. The need for the improvements is a result <br />of the State Engineer's Office dam safety requirements. Smith Geotechnical, Inc. of Fort Collins <br />commenced design in late spring 1998. Construction is scheduled for early spring and summer of <br />1999. <br /> <br />DeWeese-Dye Ditch and Reservoir Company - DeWeese Dve Reservoir Darn Rehabilitation <br /> <br />Authorization: SB 98- 1 1 89 <br />Water Source: Grape River <br />Terms of Loan: $734,000 @ 4% for 30 years <br /> <br />County: Custer - SW of Canon City <br />Project Yield: 4,020 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project consists of the replacement of the entire upper 12 feet of the DeWeese Dye <br />dam crest. The new crest section will include reinforcing bar anchors drilled and grouted into the <br />original dam and a new drainage/seepage control system. GEl Consultants, Inc. of Englewood will <br />commence designing the project in late summer 1998. Construction is scheduled for spring and <br />summer of 1999. <br />