Laserfiche WebLink
<br />North Poudre Irrigation Comoanv - Various Pioeline and Dam Improvements <br /> <br />. <br /> <br />Authorization: SB 98-1189 <br />Water Source: Cache la Poudre <br />Terms of Loan: $500,000 @ 4.03% for 20 years <br /> <br />County: Larimer - W of Wellington <br />Project Yield: 11,973 ac.ft. <br />Project Type: Dam and Pipeline Rehab. <br /> <br />This project is the rehabilitation of several North Poudre system facilities. The <br />rehabilitation projects include: 1.) Spillway construction at North Poudre Reservoir #5. 2.) Pipeline <br />construction at the North Poudre Reservoir #6 outlet. 3.) Pipeline construction along North <br />Poudre's Buckeye lateral. Smith Geotechnical, Inc. of Fort Collins is currently preparing the <br />design plans with construction scheduled for the fall of 1998 on the Reservoir #6 project. Future <br />construction schedules have not yet been determined. <br /> <br />Greelev and Loveland Irrigation Cornoanv - Equalizer Darn Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Big Thompson River <br />Terms of Loan: $308,000 @4.21% for 30 years <br /> <br />County: Larimer - E of Loveland <br />Project Yield: 885 adt. <br />Project Type: Dam Rehabilitation <br /> <br />. <br /> <br />This project is the rehabilitation of the Greeley & Loveland Irrigation Company's Equalizer <br />Reservoir located east of Loveland. The project includes replacement of the dam outlet gate with a <br />new structure, which will incorporate both the outlet gate and a spillway. The existing darn <br />embankment will also be raised almost four feet. ECI Consultants, Inc. of Englewood is currently <br />preparing the design plans with construction scheduled for the fall of 1998. <br /> <br />Riverside Reservoir and Land Comoanv - Riverside Reservoir Soillwav Rehabilitation <br /> <br />Authorization: SB 98- 1 189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @ 3.75% for 20 yrs. <br /> <br />County: Weld-NW of Wiggins. <br />Project Yield: 200 ac.ft. <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, <br />located 11 miles northwest of Wiggins in Weld County. The State Engineer has placed a storage <br />restriction on the reservoir until an emergency spillway is completed. The Riverside Reservoir and <br />Land Company has contracted with W.W. Wheeler and Associates of Denver to analyze design <br />alternatives and complete construction plans and specifications. Construction is scheduled to <br />commence in the late fall of 1998 with completion scheduled for the spring of 1999. <br /> <br />. <br />