My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00818
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:16 PM
Creation date
10/4/2006 6:44:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Proiects Under Desilro <br /> <br />Boulder & Lefthand Irrigation Comoanv - Twin Lakes Outlet Improvements <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: Boulder Creek <br />Terms of Loan: $50,000 @3.75%for 15 years <br /> <br />County: Boulder - NE of Boulder <br />Project Yield: 218 ac.ft. <br />Project Type: Dam Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures. Recent State Engineer Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete. Rocky Mountain Consultants of <br />Longrnont are currently preparing the improvement design with construction scheduled for the fall <br />of1998. <br /> <br />Western Mutual Ditch Companv - Check Dam Rehabilitation <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $100,000 @3.75%for20years <br /> <br />County: Weld - NW ofPlatteville <br />Project Yield: 20,000 ac.ft. <br />Project Type: Check Darn Rehabilitation <br /> <br />This project is the rehabilitation of the Western Mutual Ditch Company's South Platte <br />River check dam across the river from their diversion structure. The check dam creates a backwater <br />along a river side-channel created by an island on the south side of the river, and diverts the flow to <br />the Company's diversion structure on the north side of the river. The project is located in Weld <br />County, 2 miles northwest of Platteville. Rocky Mountain Consultants of Longrnont has prepared <br />the design plans and construction contract documents. Construction is scheduled to commence in <br />October and will be completed by December 1998. <br /> <br />Julesburg Irrigation District - Harmonv Ditch # 1 Diversion Structure Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Repair Acc. County: Logan - SW of Crook <br />Water Source: South Platte River Project Yield: 40,000 ac.ft. <br />terms of Loan: $590,000 @ 3.75% for 30 years Project Type: Diversion Rehabilitation <br /> <br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony <br />Ditch # 1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br />Julesburg Reservoir. Zoyiopoulos & Associates of Greeley is preparing the design plans for an <br />October 1998 construction start. Construction is scheduled for completion by late March 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.