Laserfiche WebLink
<br />. <br /> <br />CHIPPERFIELD LANE DITCH. INC. - CHPPRFLD LANE DITCH REHABILITATION <br /> <br /> <br />Looking toward the Multa Trina Ditch at the New 4-bay Concrete Division Box <br /> <br />. <br /> <br />Proiect Description <br /> <br />This $55,000 project from the 1998 Small Project Loan Account is the construction of <br />10,000 feet of pipeline replacing an existing open ditch in poor condition. The project also <br />consisted of re-construction of the existing headgate structure and a new division box at the Multa <br />Trina Ditch. The Glenwood Springs office of the Natural Resources Conservation Service prepared <br />the project design. Project construction commenced November I, 1997 by the Ditch Company's <br />own forces. The project was completed in May 1998 with substantial completion on June 1, 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: Chipperfield Lane Ditch, Inc. <br /> <br />County: Garfield <br /> <br />River: Dry Hollow Creek <br /> <br />Terms of Loan: $41,011.94@3,75% for 30 yrs. Substantial Completion Date: June 1, 1998 <br /> <br />Design Engineer: Natural Resources Conservation Service - Glenwood Springs Office <br /> <br />Construction Contractor: Chipperfield Lane Ditch, Inc. Members <br /> <br />10,000 lineal feet - 8 inch diameter PVC pipe <br />1 - 8 ft x 12 ft x 4 ft 4-bay Concrete Division Box <br /> <br />. Annual Volume of Water Delivered by the Project: 220 ac.ft, <br /> <br />Design Criteria: <br />