My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00818
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:16 PM
Creation date
10/4/2006 6:44:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />HAWKEYE LATERAL DITCH COMPANY - HAWKEYE LATERAL DITCH REHAB. <br /> <br /> <br />Delivery of the 36 in. Reinforced Concrete Pipe <br /> <br />Proiect Description <br /> <br />. This $490,000 project was the construction of approximately 13,000 linear feet of PVC <br />and RCP pipeline, with new headgate and appurtenances, replacing an existing open concrete <br />lined ditch in poor condition for the Hawkeye Lateral Ditch Company in Mesa County northeast <br />of Fruita. The Grand Junction Office of the Natural Resource Conservation Service prepared the <br />project design that was constructed by M. A, Concrete Construction, Inc. of Grand Junction, <br />Colorado commencing November 7, 1997. Construction was completed in May 1998 with <br />substantial completion on August 17, 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: Hawkeye Lateral Ditch Co, County: Mesa River: Colorado via Grand Valley Canal <br /> <br />Terms of Loan: $154,113 @ 3.75% for 30 yrs. <br /> <br />Substantial Completion Date: Aug. 17,1998 <br /> <br />Design Engineer: Natural Resource Conservation Service - Grand Junction, Colorado <br /> <br />Construction Contractor: M.A. Concrete Construction, Inc. - Grand Junction, Colorado <br /> <br />1,800 ft. - 36 in. dia. reinforced concrete pipe (RCP) <br />11,415 ft. - 3 in. to 27 in. dia. poly-vinyl-chloride (PVC) pipe <br />23 each - 6 in, to 12 in, gate valves <br /> <br />. Annual Volume of Water Delivered by the Project: 1,260 ac.ft. <br /> <br />Design Criteria: <br />
The URL can be used to link to this page
Your browser does not support the video tag.