My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00812
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:13 PM
Creation date
10/4/2006 6:44:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Flood Section - Colorado River Issues - Multi-Objective Floodplain Management Study for Roaring Fork
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />e <br /> <br />e <br /> <br />e <br /> <br />Attachment #1 <br /> <br />Status Report for the Roaring Fork- <br />Frying Pan River Multi-Objective Study <br /> <br />Work Accomplished in 1997 <br />. Spring 1997 Completion of two emergency flood protection projects at <br />Basalt and at Coffman property near Carbondale <br />. Summer 1997 Mailing of Roaring Fork River Multi-Objective <br />UPDATE newsletter to mailing list of approximately 100 people <br />. September 15, 1997 Scope of Work meeting held at Basalt Town Hall <br />. October 1997 Completion of3 tasks from September 15,1997 meeting: <br />1) Proposed Hierarchy of River Issues, 2) 2nd draft Scope of Work for consultant, 3) <br />Plan for involving Ruedi Water and Power Authority (RWAPA) in study <br />. November 13,1997 Presentation to Ruedi Water and Power Authority <br />(R W AP A) Board regarding study and discussion of their possible participation at <br />their regular meeting in Carbondale <br />. December 1997 Discussion of Scope of Work with Ruedi Water and <br />Power Authority (R W AP A) staff and subsequent revision <br /> <br />--- . ,,------- <br /> <br />Proposed Work for January - March 1998 <br />. Finalize Scope of Work for consultant <br />. Initiate RFQ process for retaining consultant Continue to communicate with R W AP A <br />regarding participation in study <br />. Prepare necessary MOU between CWCB and R W AP A <br /> <br /> . <br />Budget Status <br /> Expenditures Balance <br />Starting Total Budget $100,000 <br />1997 Emergencv Proiects - $10,000 $ 90,000 <br />Participation in Basalt Proiect - $20,000 $ 70,000 <br />Set Aside for Advance Measures/ - $10,000 $ 60,000 <br />Emergencv Proiects <br /> <br />Note: The current balance from the budget ($60,000) should be compared to the draft <br />Scope of Work (Attachment #3). It appears that all of the $60,000 (ifnot more) <br />would be required to accomplish the Scope described. <br />
The URL can be used to link to this page
Your browser does not support the video tag.