Laserfiche WebLink
<br />TASK 2 <br /> <br />TASK 3 <br /> <br />"'''-..' '.' '.. <br />.,,>~ '~ <br />., '~' ,;.: ~ <br />. . <br /> <br />To develop a plan for requesting the assistance and participation of the <br />Ruedi Water and Power Authority (RWAPA) in implementing the Multi- <br />Objective Study <br /> <br />To develop a ]"d draft Scope of Work for a consultant to perform in <br />order to address the specific river needs identified <br /> <br />2 <br />e <br /> <br />On November 13, 1997 a presentation was made to the Ruedi Water and Power Authority <br />(RWAPA) to address the possibility of their participation in the Multi-Objective study. <br />The R W AP A board members at that meeting expressed interest in discussion of potential <br />participation. They expressed a desire, however, to receive more details about potential <br />administrative and financial arrangements for their participation. <br /> <br />This memorandum, through attachments, describes the overall status of the study and the <br />specific status of the three tasks addressed at the September 15 meeting in Basalt. <br />Briefly, the results of the September meeting were as follows: <br /> <br />TASK 1 <br /> <br />TASK 2 <br /> <br />TASK 3 <br /> <br />River issues identified between November 1996 and September 1997 <br />were prioritized. <br /> <br />A preliminary plan for involving the Ruedi Water and Power <br />Authority in the study was developed. <br /> <br />The 1st draft of the Scope of Work for the study consultant was <br />refined into a 2nd draft. <br /> <br />e <br /> <br />Four attachments are provided with this memorandum. Attachment #1 is a brief Status <br />Report on the Multi-Objective Study. Attachment #2 is the proposed Hierarchy of River <br />Issues stating, in order from most important to least important, what the issues are that <br />the study will address. Attachment #3 is a description of the proposed plan for <br />requesting, and hopefully obtaining, the assistance and participation of R W AP A. <br />Attachment #4 is a 3rd draft Scope of Work describing what the consultant retained <br />would do. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends that the Board endorse the proposed Hierarchy of River Issues and <br />the proposed Scope of Work and direct the staff to proceed with retaining a consultant to <br />accomplish the Scope of Work. <br /> <br />1:/wctrans/board mem/jan981jan9829j.bdm <br /> <br />e <br />