My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00812
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD00812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:54:13 PM
Creation date
10/4/2006 6:44:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Flood Section - Colorado River Issues - Multi-Objective Floodplain Management Study for Roaring Fork
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK 2 <br /> <br />TASK 3 <br /> <br />"'''-..' '.' '.. <br />.,,>~ '~ <br />., '~' ,;.: ~ <br />. . <br /> <br />To develop a plan for requesting the assistance and participation of the <br />Ruedi Water and Power Authority (RWAPA) in implementing the Multi- <br />Objective Study <br /> <br />To develop a ]"d draft Scope of Work for a consultant to perform in <br />order to address the specific river needs identified <br /> <br />2 <br />e <br /> <br />On November 13, 1997 a presentation was made to the Ruedi Water and Power Authority <br />(RWAPA) to address the possibility of their participation in the Multi-Objective study. <br />The R W AP A board members at that meeting expressed interest in discussion of potential <br />participation. They expressed a desire, however, to receive more details about potential <br />administrative and financial arrangements for their participation. <br /> <br />This memorandum, through attachments, describes the overall status of the study and the <br />specific status of the three tasks addressed at the September 15 meeting in Basalt. <br />Briefly, the results of the September meeting were as follows: <br /> <br />TASK 1 <br /> <br />TASK 2 <br /> <br />TASK 3 <br /> <br />River issues identified between November 1996 and September 1997 <br />were prioritized. <br /> <br />A preliminary plan for involving the Ruedi Water and Power <br />Authority in the study was developed. <br /> <br />The 1st draft of the Scope of Work for the study consultant was <br />refined into a 2nd draft. <br /> <br />e <br /> <br />Four attachments are provided with this memorandum. Attachment #1 is a brief Status <br />Report on the Multi-Objective Study. Attachment #2 is the proposed Hierarchy of River <br />Issues stating, in order from most important to least important, what the issues are that <br />the study will address. Attachment #3 is a description of the proposed plan for <br />requesting, and hopefully obtaining, the assistance and participation of R W AP A. <br />Attachment #4 is a 3rd draft Scope of Work describing what the consultant retained <br />would do. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends that the Board endorse the proposed Hierarchy of River Issues and <br />the proposed Scope of Work and direct the staff to proceed with retaining a consultant to <br />accomplish the Scope of Work. <br /> <br />1:/wctrans/board mem/jan981jan9829j.bdm <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.