My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00736
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:37 PM
Creation date
10/4/2006 6:43:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/18/1958
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lU13 <br /> <br />I <br /> <br />A system of open canals, tunnels, <br />and siphons would convey water from the <br />reservoir to the project area. The area <br />consists of some 33,000 acres of new land <br />and 10,000 acres now irrigated with only <br />a partial water supply. <br /> <br />Investigations are scheduled to be re- <br />sumed on this project this fiscal year. How- <br />ever, investigations cannot start until Con- <br />gress has appropriated funds for this purpose. <br />Nucla and Saucer Valley projects are included <br />as units under the San Miguel project investi- <br />gations and will be so covered in the feasibil- <br />ity report. <br /> <br />This year's work will consist of land <br />classification and drainage review to determine <br />future work, initiation of field surveys in <br />latter part of fiscal year to obtain feasibil- <br />ity design data, preliminary geologic appraisals <br />of diversion sites and canal structure sites <br />not covered previously, and plan formulation <br />studies." <br /> <br />MR. MOSES: <br /> <br />"Thank you Mr. Crabtree. <br />the Board have any questions. <br />want to say anything?" <br /> <br />Any member of <br />Does anyone else <br /> <br />MR. JER~ffiN: <br /> <br />"I have only one thing pretty well current <br />on the investigation. The Paonia Project, of <br />course, with the good work of our local and <br />State people, and your congressional delegation, <br />is expected to be released in the very near <br />future. . <br /> <br />I <br /> <br />The construction of the dam and spillways <br />of the Collbran Project is going forward. The <br />South Side Canal will be started in the Spring. <br /> <br />We originally reported that the feasibil- <br />ity report on the Crawford Project would be <br />out about the first of the fiscal year but <br />because of some delays in priorities and the <br />Curecanti unit, the Crawford has been delayed. <br />It will be out this Fall. <br /> <br />By the way, let me say with reference to <br />Mr. Crabtree, we in the Regional Office feel we <br />have a very efficient office here in Durango <br />covering investigations of the San Juan area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.