My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00730
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:34 PM
Creation date
10/4/2006 6:43:26 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/15/2005
Description
Flood Section - Chatfield Downstream Channel Improvement Project - Easement Fee Structure Revision
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />STATE OF COLORADO <br /> <br />e <br /> <br />Colorado Water Conservation Board <br />Department of Nataral Resources <br />1313 Shennan Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Attachment A <br />Chatfield Downstream Channel Improvement Project <br />Easement Fee Structure <br />May 13, 2005 <br />(Revised November 1, 2005) <br /> <br />Bill Owens <br />Governor <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Rick Brown <br />Acting Deputy Director <br /> <br />e <br /> <br />BACKGROUND <br />At the November 6-7, 1995 and January 24-25, 1996 Board Meetings, several easements across CWCB <br />Rights-Of-Way along the Chatfield Downstream Channel Improvement Project were approved by the <br />Board. Following the approvals, the Board directed staff to develop a fee structure to be used as <br />consideration for CWCB granting of easement. At the March 23, 2005 Board meeting, staff was <br />requested to review and make a recommendation on the fee structure for the "Chatfield Downstream <br />Channel Improvement Project Easement Fee Structure" dated March 6, 1996. <br /> <br />DISCUSSION <br />CWCB staff consulted with five entities which have experience in granting easements and charging <br />fees for said easements: 1) City of Fort Collins (Stormwater Utility); 2) City of Littleton; 3) Urban <br />Drainage and Flood Control District (UD & FCD); 4) Colorado State Land Board; and 5) Colorado <br />Attorney General's Office. Based on those discussions, the following fee detennination methods were <br />developed. In May 2005, the staff communicated with a number of entities that have to address the <br />CWCB's real estate easement fee issues. These communications have aided the staff in making <br />additions and changes to the existing easement fee structure. <br /> <br />Procedure for the Computation of Easement Fees for the CWCB's <br />South Platte River Right-Of-Way. <br /> <br />Method I Market Value Method <br /> <br />e <br /> <br />This method shall consider the market value of the subject site. It will require an appraisal or <br />market survey to determine what is the fair market value for the easement based on comparable <br />land values in the area at the time of rtegotiations. The applicants must provide these <br />appraisals/surveys to the Board in order to establish the fair market value for the subject <br />property. <br /> <br />The cost of said appraisals/surveys would be borne by the applicant. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.