Laserfiche WebLink
<br />.. <br /> <br />e <br /> <br />e.) <br /> <br />e <br /> <br />Engineer or' an' authorized ditch representative under the supervision <br /> <br />of the State Engineer. The State Engineer will monitor and'control <br /> <br />) <br /> <br />the amount of water taken by each irrigation canal. The physical <br /> <br />operation of all other regulating valves on the canal supply penstocks <br />will be made by the Government. The State Engineer will be notified <br /> <br />by the Government of any emergency that will affect the delivery of <br /> <br />the terminal end at any canal penstock. <br /> <br />b. River Outlet Gates. The physical operation of the river <br /> <br />control gates located in the control tower of the dam will be made by <br /> <br />the Government. <br /> <br />Article 5. Sta!l:e-Discharge Reference Gaj1;es. <br /> <br />a. Reservoir Pool Level Gaj1;e. The reservoir elevation utilized <br /> <br />in determining the storage content of the reservoir will be obtained <br /> <br />....--. <br /> <br />from the pool level recorder located in the control tower of the Dam <br /> <br />For convenience in operation, the tower pool recorder reading will be <br /> <br />remotely registered in the office of the Reservoir Superintendent and <br />may be utilized in lieu of the tower reading for determining reservoir <br /> <br />storage content. The tower recorder will be considered the official <br /> <br />register of pool elevation in the event of conflict. <br />b. Reservoir Outflow Ga~es. <br />(1) Outflow to River. The amount of water released from the <br /> <br />reservoir to the river will be determined from the gage height measured <br /> <br />at the river gaging station located approximately 800 feet below the <br /> <br />dam. The river gage height will be recorded at the gaging station and <br /> <br />'-". <br /> <br />-4- <br />