My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00718
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:29 PM
Creation date
10/4/2006 6:43:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
Flood Section - Chatfield Reservoir Drought Declaration
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />" <br /> <br />remotely transmitted to, and registered in, the office of the <br /> <br />Reservoe <br />from stage- <br /> <br />Superintendent. The river discharge will then be determined <br /> <br />discharge rating tables furnished by the State Engineer. To assure <br />that the stage-discharge relation'ship 1s kept current, the State Engineer <br /> <br />will obtain the results of State, U. S. Geological Survey, and Corps of <br />Engineers discharge maasurements each week and fUrnish to the Reservoir <br /> <br />Superintendent the appropriate "gage shiftll to be applied to the baSic <br /> <br /> <br />rating table to obtain the current discharge amount. This IIgage shift" <br /> <br />will be furnished to the Reservoii' Superintendent weekly on Monday <br />morning and such shift shall be simultaneously utilized by all parties <br />in computing reservoir outflow un1ess a new shift is computed by the <br />State Engineer during the week and furnished to the Reservoir Superin- <br />tendent. This wil1 insure that all parties will determine the sarnee <br />river flow value at all times, irrespective of variations between <br /> <br />measurements by different parties at different times. However, when <br /> <br />this gaging station is not operational, the release will be determined <br /> <br />,by outlet ratings correlated with stream discharge measurements below <br /> <br />the dam. <br /> <br />(2) Outflow to Canals. Appropriate rating flumes and recorders <br /> <br /> <br />have been installed in each of the canals immediately below the supply <br /> <br />penstock terminal control valves wqereby the canal flow may be measured <br />and recorded. Waseeways installed ,upstream of these flumes in each <br />ditch during the cons truction phase will be removed by the Government <br /> <br />prior to placing the permanent supply system in operation. <br /> <br />The State <br /> <br />-5- <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.