My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00714
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:28 PM
Creation date
10/4/2006 6:43:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/9/1975
Description
Agenda or Table of Contents, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />B. Pre die tea Runoff <br /> <br />1. April-July 1975 forecast--10.5 MAr <br /> <br />2. Water year 1975 total--14.6. MAF, 120% of normal. <br /> <br />II. Water supply <br /> <br />A. Lake Powell <br /> <br />1. Releases to lower basin during water year 1975 will be <br />about 9.9 MAF in accordance with P.L. 90-537 criteria for <br />long range operation of reservoirs of the Colorado River. <br /> <br />2. Lake at 3.669 feet July 1 with live storage content <br />(20.3) MAF. <br /> <br />3. Predicted high in 1975--3.679 feet with 21.7 MAF, about <br />87 percent of its active capacity. <br /> <br />B. Flaming Gorge Reservoir <br /> <br />1. July 1 - 6,035 feet with live storage content 3,540,000 <br />acre-feet. <br /> <br />2. Should fill in July at elevation 6,040 feet with live <br />storage of 3,750,000 acre-feet. <br /> <br />C. Fontenelle Reservoir <br /> <br />1. Reservoir July 1 at 6,488 feet with live storage content <br />212,000 acre-feet. <br /> <br />2. Should fill with spring runoff to elevation 6,506 feet with <br />345,000 acre-feet. <br /> <br />3. All efforts will be made to fulfill operation rules. <br /> <br />D. Curecanti Unit <br /> <br />1. Blue Mesa Reservoir <br /> <br />I <br /> <br />a. July 1 at elevation 7,479 feet with live storage <br />content 496,000 acre-feet <br /> <br />b. Predicted high in 1975 - elevation 7,512 feet with <br />760,000 acre-feet. <br /> <br />c. Will not fill - to hedge on anticipated flows past the <br />Crystal damsite. <br /> <br />2. Morrow Point Reservoir <br /> <br />a. July 1 - at 7,153 feet with live storage content <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.