My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00714
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:28 PM
Creation date
10/4/2006 6:43:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/9/1975
Description
Agenda or Table of Contents, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />111,000 acre-feet. <br /> <br />b. Should remain near full regardless of snow melt <br />runoff above Blue Mesa. <br /> <br />E. Navajo Reservoir <br /> <br />1. July 1 - at elevation 6,068 feet with live storage content <br />of 1,452,000 acre-feet. <br /> <br />2. Should rise in 1975 to 6,073 feet with a live storage <br />content of 1,520,000 acre-feet. Held above elevation <br />6,040 until December 1 for recreational purposes. <br /> <br />F. Lake Mead <br /> <br />I <br /> <br />1. July 1 at elevation 1~174 feet with available storage of <br />19.4 MAF. . <br /> <br />a. 74 percent of active storage. <br /> <br />b. Reservoir is about 5 feet higher than a year ago. <br /> <br />2. Should rise to elevation 1,185 feet by September 30, 1975 <br />because P.L. 90-537 criteria releases at Glen Canyon Dam <br />will exceed lower basin water requirements. <br /> <br />III. Construction activities <br /> <br />A. Good progress at Crystal Dam <br /> <br />1. Excavation completed for the keyways of the dam and the <br />powerplant area, June 1974. <br /> <br />2. Placed the first concrete of the 1975 season in the power- <br />plant on April 17, 1975. <br /> <br />a. About 59,000 cubic yards of concrete have been placed <br />in the dam by June 1975. The highest block is 50 <br />feet above the old streambed and 150 feet above the <br />foundation excavation with the remaining blocks <br />slightly less. The dam concrete placement is 30% <br />complete. <br /> <br />The powerplant concrete foundation work was 100% <br />complete by June 1975. The remainder of the powerplant <br />structural concrete work is 30% finished with 12,300 <br />cubic yards in place. <br /> <br />b. <br /> <br />c. <br /> <br />Contract is approximately 60.1% completed. <br /> <br />I <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.