My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00714
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:28 PM
Creation date
10/4/2006 6:43:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/9/1975
Description
Agenda or Table of Contents, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />based upon considerations of effectiveness, economics, and environmental <br />impacts. The 'estimateo'construction period will run from fiscal year <br />1977 to fiscal year 1980. <br /> <br />Economic Data <br /> <br />In terms of June 1975 prices, construction costs would be nearly $20 I <br />million, and total annual costs would be $1.6 million. . The cost for <br />removing one ton of salt would be $9.00. The control facilities in <br />Paradox Valley would remove up to 180,000 tons of salt per year, thereby <br />decreasing the salinity at Imperial Dam by about 16 mg/l annually. <br />This salinity reduction would affect the water users in the Lower Colo- <br />rado River Basin in terms of increased crop yields, reduced soil <br />leaching requirements, reduced management costs, lower water treatment <br />costs, less pipe corrosion, and reduced use of soap and detergents. <br /> <br />Potential Effects and Costs <br /> <br />Present salt loading of Dolores River (tons per year) <br />Estimated reduction in salt <br />Effect of reduction at Imperial Dam (mg/l) <br />.Cost effectiveness (5.625 percent over a 100 year period) <br /> <br />200,000 <br />180,000 <br />16 <br /> <br />Total annual cost <br /> <br />$19,460,000 <br />2,006,000 <br />-449.000 <br />$21,017,000 <br />1,187,000 <br />438.000 <br />$ 1,625,000 <br />$9.00 <br /> <br />Construction cost (June 1975 prices) <br /> <br />Interest during construction <br /> <br />Less preauthorization costs <br /> <br />Total investment <br /> <br />Annual equivalent of investment <br />Annual OM&R <br /> <br />Cost per ton of salt removed <br /> <br />MR. STAPLETON: Are there any questions now on San Miguel or any of the <br />other projects? <br /> <br />SENATOR NOBLE: In the Dry Creek area, you spoke about <br />in with the Paradox salinity under control, so that we <br />and bring those lands back in. <br /> <br />how it might fit I <br />could go ahead <br /> <br />MR. COOK: At this point, Senator Noble, that opportunity may still lie <br />ahead of us. <br /> <br />SENATOR NOBLE: I think the people over there are still interested in <br /> <br />-28- <br />
The URL can be used to link to this page
Your browser does not support the video tag.